30 C.F.R. PART 817--PERMANENT PROGRAM PERFORMANCE STANDARDS--UNDERGROUND MINING ACTIVITIES
TITLE 30--Mineral Resources
CHAPTER VII--OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR
SUBCHAPTER K--PERMANENT PROGRAM PERFORMANCE STANDARDS
PART 817--PERMANENT PROGRAM PERFORMANCE STANDARDS--UNDERGROUND MINING ACTIVITIES
|
Casing and sealing of exposed underground openings: General requirements.
|
|
|
Casing and sealing of underground openings: Temporary.
|
|
|
Casing and sealing of underground openings: Permanent.
|
|
|
Hydrologic-balance protection.
|
|
|
Hydrologic balance: Water quality standards and effluent limitations.
|
|
|
Hydrologic balance: Sediment control measures.
|
|
|
Hydrologic balance: Siltation structures.
|
|
|
Hydrologic balance: Discharge structures.
|
|
|
Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities.
|
|
|
Hydrologic balance: Stream buffer zones.
|
|
|
Use of explosives: General requirements.
|
|
|
Use of explosives: Preblasting survey.
|
|
|
Use of explosives: General performance standards.
|
|
|
Use of explosives: Blasting signs, warnings, and access control.
|
|
|
Use of explosives: Control of adverse effects.
|
|
|
Use of explosives: Records of blasting operations.
|
|
|
Disposal of excess spoil: General requirements.
|
|
|
Disposal of excess spoil: Valley fill/head-of-hollow fills.
|
|
|
Disposal of excess spoil: Durable rock fills.
|
|
|
Disposal of excess spoil: Preexisting benches.
|
|
|
Coal mine waste: General requirements.
|
|
|
Coal mine waste: Refuse piles.
|
|
|
Coal mine waste: Impounding structures.
|
|
|
Coal mine waste: Burning and burned waste utilization.
|
|
|
Disposal of noncoal mine wastes.
|
|
|
Stabilization of surface areas.
|
|
|
Protection of fish, wildlife, and related environmental values.
|
|
|
Contemporaneous reclamation.
|
|
|
Backfilling and grading: General requirements.
|
|
|
Backfilling and grading: Previously mined areas.
|
|
|
Backfilling and grading: Steep slopes.
|
|
|
Revegetation: General requirements.
|
|
|
Revegetation: Mulching and other soil stabilizing practices.
|
|
|
Revegetation: Standards for success.
|
|
|
Subsidence control: Public notice.
|
|
|
Cessation of operations: Temporary.
|
|
|
Cessation of operations: Permanent.
|
|
|
Interpretative rules related to general performance standards.
|
|