32 C.F.R. Subpart B—Demand On Carrier, Contractor, or Insurer
Title 32 - National Defense
Subpart B addresses the recovery process for loss or damage occurring during the storage or transport of household goods and other personal property for which military personnel and civilian employees were paid under the provisions of 31 U.S.C. 3721. The authority for pursuing recovery action is found at 31 U.S.C. 3711. (a) Responsibility. Recovery of amounts due for personal property lost or damaged while in transit or in storage at Government expense is a joint Personal Property Office/Naval Legal Service Office responsibility. In order to establish liability and to effectively pursue a recovery claim against a carrier, warehouseman, or other third party, it is essential that all required action be accomplished in an expeditious manner. Failure of the property owner or any Government agent to exercise diligence in the performance of duties may render collection of the claim impossible and thereby deprive the Government of rightful revenue. Claims approving and settlement authorities will ensure that all actions required of the property owner and naval personnel are accomplished promptly. (b) Elements of collection. There are four elements in the successful assertion and collection of a recovery claim. They are: (1) Proving that a transit loss occurred; (2) Determining who had responsibility for the goods at the time of the transit loss; (3) Calculating the amount of damages; and (4) Pursuing the responsible party or parties vigorously. (a) Notice of loss. Claims office personnel must ensure that Notice of Loss or Damage, DD Form 1840R, is properly completed and dispatched to the liable third party or parties within 75 days of delivery of the property. (b) Counseling of claimant. Claims office personnel should coordinate with the local personal property office to ensure proper counseling regarding potential claim procedures. (c) Documents. Claims office personnel must obtain from the claimant or from the transportation office the following documents needed to process recovery actions: (1) A copy of the GBL or other document used for shipment or storage. (2) A copy of the inventory. (3) A copy of the DD Form 1840 and DD Form 1840R. (4) Where storage in transit was extended from 180 days to 270 days, a copy of the authorization from the transportation office allowing this extension at Government expense. (5) Where storage converted from Government paid storage to storage at owner's expense, a copy of the claimant's contract with the warehouse. (6) When necessary, a copy of DD Form 1164, Service Order for Personal Property, from the transportation office. (7) When necessary, DD Form 619–1, Statement of Accessorial Services Performed, from the transportation office. (d) Carrier inspection. Claims office personnel should inform claimants that the carrier has the right to inspect damaged goods within 75 days of delivery, or 45 days of dispatch of DD Form 1840R, whichever is later, and that damaged items must be held out for carrier inspection during that period. Essential items such as washer, dryer, television etc., may be repaired prior to that time if necessary. (e) Repair estimates. Claims personnel must ensure that repair estimates describe the specific location and damage claimed and that the same damage is claimed on DD Form 1844, Schedule of Property and Claims Analysis Chart. Repair estimates that merely note “refinished” or “repaired” are not acceptable. (f) DD Form 1844. Claims personnel must ensure that DD Form 1844 is properly completed with the nature and extent of the loss or damage to each item fully described, the correct inventory numbers supplied, and correct item weights utilized from the Military-Industry Table of Weights (when these weights are required for the code of service involved). (g) Demands on third parties. Claims personnel must ensure that written demands against appropriate third parties are prepared as described in §751.26 and §751.27. No demand will be made where it conclusively appears that the loss or damage was caused solely by Government employees or where a demand would otherwise be clearly improper under the circumstances. If it is determined that a demand is not required, a brief written statement setting forth the basis for this determination will be included on the chronology sheet. Pursuant to the Joint Military-Industry Agreement on Claims of $25.00 or Less, claims of $25.00 or less will not be pursued because administrative costs outweigh recovery proceeds. (a) Exceptions. The claimant is required to take exceptions and note any loss of damage at the time of delivery on the DD Form 1840 (Joint Statement of Loss or Damage at Delivery). Later discovered damage must be noted on the DD Form 1840R (Notice of Loss or Damage) and delivered to the claims office or Personal Property Office within 70 days of delivery. Failure to take exceptions at delivery and note and report later discovered damage will result in deduction on any lost potential carrier recovery from payment of the claim. Failure to note on the DD Form 1840 items missing at the time of delivery may result in denial of claims for those items. (b) DD Form 1840/1840R. The DD Form 1840/1840R is printed in carbon sets of five with DD Form 1840 on the front side and DD Form 1840R on the reverse side. DD Form 1840/1840R is provided by the carrier to the member at delivery. Carriers were required to use this revised DD Form 1840/1840R beginning 15 August 1988 for international shipments and 15 September 1988 for domestic shipments. This is the only document the carriers will accept for reporting loss and damage to household goods. The requirement to list all know loss and damage at the time of delivery on the DD Form 1840 is a joint responsibility of the claimant and the carrier. If the carrier fails to give the claimant a DD Form 1840 at the time of the delivery, the carrier is liable for all damage and does not have to be notified in the 75-day timeframe (c) Military-Industry Memorandum of Understanding on Loss and Damage Rules. The Military-Industry Memorandum of Understanding on Loss and Damage Rules became effective in 1985 with the implementation of the new DD Form 1840/1840R. This document should be thoroughly studied and completely understood. (a) Codes 1 and 2 (domestic including Alaska). Increased released valuation, also referred to as “Basic Coverage,” became effective within CONUS and Alaska on 1 April 1987 for intrastate shipments (shipments within a single State), and on 1 May 1987 for interstate shipments (shipments from one State to another). For Codes 1 and 2 shipments picked up after these dates, the carrier's released valuation (the carrier's maximum liability for loss and damage) increased from $.60 per pound per article to $1.25 multiplied by the net weight of the shipment ($2.50 for shipments to and from Alaska). For Codes 1 and 2 shipments picked up prior to these dates, carrier liability remains at $.60 per pound per article and is calculated the same as for Code 4 shipments. There are also two higher levels of coverage available in which the owner pays the difference between the basic coverage and the higher level requested: High or higher increased released valuation (Option 1) and full replacement protection (Option 2). These higher carrier released valuation rates only apply to Codes 1 and 2 shipments and they do not affect the liability of a non-temporary storage (NTS) warehouse which remains at $50.00 per line item. (1) Increased Released Valuation (IRV). IRV is the basic valuation for service Codes 1 and 2 and is fully paid by the Government. If the claimant is due additional recovery money, the words “claimant due carrier recovery” must be added on the claims file to ensure the recovered amount is provided to the claimant if eligible. IRV is not reflected on the GBL by any special language. For Codes 1 and 2 shipments picked up after the effective dates mentioned above, the carrier's released valuation is $1.25 multiplied by the new weight of the shipment ($2.50 multiplied times the net weight of the shipment for shipments to and from Alaska). For example, if the weight of an IRV shipment moved from Kansas to New York is 10,000 pounds, the most the carrier could be held liable for would be $12,500 (10,000 pounds times $1.25=$12,500). If the same shipment was moved from Alaska to New York, the maximum carrier liability would instead be $25,000 (10,000 pounds times $2.50=$25,000). (2) Higher Increased Released Valuation (Option 1). This type of coverage may be purchased by an owner who desires protection for items whose value exceeds a maximum allowance or for a shipment whose value exceeds the statutory maximum. If the claimant is due additional recovery money, the words “claimant due carrier recovery” must be added in the claims file. Option 1 must be annotated on the original GBL. A GBL correction notice is acceptable only if the carrier or his agent has notice of the correction before pick-up. Option 1 may be listed in block 27 or block 30 either as a lump sum, such as “Option 1—$30,000,” or as a multiple, such as “Option 1—$3.00 times the net weight.” The carrier's maximum liability is whatever higher valuation the claimant places on the shipment. For example: The owner of a 10,000 pound shipment requests Option 1 coverage of $30,000.00 and has this listed on the GBL. The carrier's maximum liability is $30,000.00. Under basic coverage, the carrier's maximum liability for this shipment would only be $12,500.00. The claimant must initially file a claim with the carrier. The Government will only accept a claim if the carrier denies the claim, if delay would cause hardship, or if the carrier fails to satisfactorily settle the claim within 30 days. The claim is adjudicated in the normal fashion, applying depreciation and maximum allowances. Demand is then made on the carrier for the full value of the item lost or damaged. When recovery is effected, the Government keeps an amount equal to that paid to the claimant and disperses the remaining recovery to the claimant. (3) Full Replacement Protection (Option 2). This type of coverage may be purchased by an owner who desires protection for items whose value exceeds a maximum allowance, for a shipment whose value exceeds the statutory maximum, or because the claimant does not wish to have the replacement cost of destroyed or missing items depreciated to their fair market value. The minimum coverage available under Full Replacement Protection is $21,000.00 or $3.50 times the net weight of the shipment, whichever is greater. A member who chooses this coverage must initially file a claim with the carrier, allowing the carrier the right to repair or replace items. The Government will only accept a claim if the carrier denies the claim, if delay would cause hardship, or if the carrier fails to satisfactorily settle the claim within 30 days. If a claim is submitted to the Government, the claim is adjudicated normally, applying depreciation and maximum allowances. The claimant should be informed that any additional amount will be forwarded after recovery action is effected against the carrier. Option 2 must be annotated on the original GBL. A GBL correction notice is acceptable only if the carrier or his agent receives notice of the correction before pick-up. Option 2 may be listed in block 27 or block 30 either as a lump sum, such as “Full Replacement Protection—$50,000.00,” or as a multiple, such as “Full Replacement Protection—$3.50 times the net weight.” The carrier's maximum liability is the higher valuation the claimant places on the shipment. For example: The owner of a 10,000 pound shipment requests full replacement protection of $3.50 times the net weight of the shipment and has this listed on the GBL. The carrier's maximum liability is $35,000.00 (10,000 pounds times $3.50=$35,000.00). Under basic coverage, the carrier's maximum liability for this shipment would only be $12,500.00. (4) Calculating liability on IRV, Option 1, and Option 2 shipments. (i) Under IRV and Option 1, the carrier's maximum liability for loss or damage to a single item is limited to the repair cost or depreciated replacement cost of the item. Under Option 2, the carrier's maximum liability for a single item is the repair cost or the undepreciated replacement cost of the item. The carrier's maximum liability for the entire claim is limited to the released valuation, which is either the lump sum declared by the owner or the net weight of the shipment times the applicable multiplier. The net weight of the shipment is normally listed in block 4 of DD Form 1840 (block 3 of DD Form 1840 dated September 84). If the net weight is missing, it should be obtained from the transportation office. (ii) In completing the carrier liability section of DD Form 1844, ignore the Joint Military-Industry Table of Weights. Assert the amount adjudicated on each item for which the carrier is liable in the carrier liability column. Where the Government payment was limited by application of a maximum allowance (or by depreciation on full replacement cost claims), assert the full, substantiated value. Total the amounts for which the carrier is liable in the carrier liability column. If this total exceeds the maximum carrier liability for the entire claim, the maximum carrier liability should be entered on DD Form 1843 as the amount demanded. Do not, however, change the total of the amounts for which the carrier is liable on the DD Form 1844. (iii) If the amount the claimant receives from the Government is limited by application of a maximum allowance (or by depreciation on full replacement protection claims) leaving the claimant with an uncompensated loss, the claimant may be due reimbursement from recovery money after recovery is effected on the claim. Claimants with uncompensated losses who have basic coverage are only entitled to reimbursement from recovery money if the amount recovered exceeds the amount paid by the Government (unless the loss was in excess of the statutory maximum). Claimants with uncompensated losses who purchased Option 1 or Option 2 are entitled to reimbursement up to the value of their additional coverage. Such files should be marked: “claimant due carrier recovery.” The claimant should be informed that recovery from the carrier is dependent on the amount and quality of the substantiation the claimant provided, and that the actual recovery may be less than anticipated. The claimant should further be informed that considerable time will elapse before recovery is effected and reimbursement made. Such claims should be processed for recovery action as expeditiously as possible. (b) Codes 4 and 6 (International and Hawaii). On Codes 4 and 6, international GBL shipments, carrier liability is computed at $.60 per pound multiplied by the weight of the article or carton as prescribed by the Joint Military-Industry Table of Weights. In cases where the entire shipment is lost or damaged, liability will be computed on the net weight of the shipment times $.60 per pound. The net weight of the shipment may be obtained from the origin transportation office. (c) Codes 5 and T (International and Hawaii). (1) A Code 5 shipment is the movement of household goods in Military Traffic Management Command (MTMC) approved door-to-door shipping containers (wooden boxes) and where a carrier provides line-haul service from origin residence to a military ocean terminal. The Government, through the Military Sealift Command (MSC), provides ocean transportation to the designated port of discharge, and the carrier provides line-haul service to the destination residence. (2) A Code T shipment is the movement of household goods where the carrier provides containerization at origin and transportation to the designated Military Airlift Command (MAC) terminal. MAC provides terminal services at both origin and destination, and air transportation to a designated MAC terminal. The carrier provides transportation to the destination residence. (3) On Code 5 and T shipments, it is often difficult to decide whether the Government or the carrier was in actual custody of the shipment at the time of loss or damage. In order to reduce liability disputes in such situations, a 50-percent compromise agreement between industry and the military has been reached. (4) When the 50-percent compromise is appropriate or applicable, the DD Form 1844 is prepared in the normal fashion utilizing weights indicated in the Military-Industry Table of Weights multiplied by $.60 per pound. Two different sums should be listed for carrier liability at the bottom of the DD Form 1844, the amount of liability due under the 50-percent compromise and the full amount that will be offset if carrier fails to pay, e.g., “$100.00 Code T, $200.00 Full Liability.” This same computation should be reflected in the “amount of claim” box on DD Form 1843 (Demand on Carrier/Contractor). If a carrier refuses to make a satisfactory settlement or fails to make a timely response to the demand, the carrier's full liability will be collected. (d) Codes 7, 8, and J (Unaccompanied Baggage Shipments). Gross Weight Rules. Government payment to the carrier for transportation of unaccompanied baggage (Codes 7, 8, and J) is based upon gross weight of the shipment. Unless the inventory is prepared as a “Proper Household Goods Descriptive Inventory,” computation of carrier liability for loss or damage incurred in a Code 7, 8, or J shipment will also be based upon gross weight. Gross weight is defined as the total weight of all articles, including necessary packing materials and packing containers. The shipping container is the external crate (tri-wall or other Government approved container) into which individual articles and/or packing cartons are placed. For the majority of claims, liability will be asserted on gross weight of the container. (2) Baggage shipments prepared using a “Proper Household Goods Descriptive Inventory.” The Joint Military/Industry Table of Weights will apply to Code 7, 8, or J unaccompanied baggage shipments if the inventory has been prepared as a “Proper Household Goods Descriptive Inventory,” in accordance with Paragraph 54 of the Tender of Service for Personal Property Household Goods and Unaccompanied Baggage (DOD 4500.34–R, appendix A). A properly prepared inventory should reflect the size of each individual carton, give a general description of carton contents, and note preexisting damage. The complete inventory, not just a portion, must have been prepared as a proper household goods inventory. If an inventory is only partially prepared as a proper household goods descriptive inventory, gross weight will be used. (e) Local moves and NTS. There are basically two types of NTS shipments: A direct delivery from NTS by the same company that stored the property and a delivery from NTS which was picked up at the warehouse by a GBL carrier. Direct deliveries of household goods from NTS are often erroneously construed as local moves. It is sometimes difficult to tell the difference between the two since a shipment delivered from NTS by the warehouseman is usually also a short distance (local) move. The type of contract involved determines whether or not the shipment is considered a local move, a direct delivery from NTS, or a carrier delivery picked up from NTS. These distinctions are important since different liability is involved. (1) Local move. A local move is a shipment performed under a local contract that authorizes property to be moved from one residence to another within a specified area (usually a move from off base to on base, or the reverse). The contract for a local move is the purchase order prepared by the transportation office which lists the services required of the carrier in accordance with the provisions of the Federal Acquisition Regulation (FAR). The purchase order usually includes packing and picking up the goods at origin residence or from storage, transporting the goods within a designated distance, and delivering and unpacking the goods at destination. All these services are performed under the authority of one purchase order and will usually be accomplished the same day or within a few days of pickup. Timely notice must exist in order to pursue carrier recovery and liability is usually based on a released valuation of $.60 per pound per article. The Joint Military/Industry Table of Weights is used to calculate liability. There is no insurance coverage required on local contractors; if the local contractor is no longer in business or bankrupt, the file may be closed. (2) Direct delivery from NTS. In circumstances where one contractor is responsible for pick-up, NTS, and delivery of the shipment, liability for loss or damage is assessed against that carrier. Nontemporary storage of household goods requires completion of DD Form 1164 (Service Order for Personal Property) in accordance with the provisions of the Basic Ordering Agreement (BOA). The “handling-in” portion of the shipment is accomplished by issuance of the Initial Service Order, DD Form 1164. The goods are usually stored for a period of 6 months to 4 years. The “handling-out” and post-storage services are accomplished by a supplemental service order. These are usually long term storage, short distance moves processed under the authority of at least two documents: the initial service order and the supplemental service order. The BOA states that the contractor shall be liable “in an amount not exceeding fifty dollars ($50.00) per article or package listed on the warehouse receipt or inventory form” (i.e., $50.00 per inventory line item). (3) Carrier delivery picked up from NTS. The NTS portion of the shipment requires completion of an Initial Service Order, DD Form 1164, to accomplish the “handling-in” of the goods into the warehouse for storage, as prescribed by the provisions of the BOA. When storage is terminated, the “handling-out” and post-storage services are accomplished by issuance of a GBL in accordance with the tender of service. The GBL may be issued to a different company or in some cases to the same company that stored the goods. These are long-term storage, long-distance moves processed under the authority of two documents: the initial service order and the GBL. Liability is assessed entirely against the delivering carrier at whatever rate is appropriate for the code of service involved, unless the carrier prepares an exception sheet (rider) noting damage or loss at the time the goods are picked up from the warehouse. The exception sheet must be signed by a warehouse representative. If a valid exception sheet exists, liability for items noted on the exception sheet is assessed against the NTS warehouse at $50.00 per inventory line item. An exception sheet should be prepared by the GBL carrier who picks up the goods from NTS even if that carrier is the same company that stored the goods. This is necessary in order to relieve the carrier from liability as a carrier. If either the carrier alone, or both the carrier and the NTS facility, fail to pay their proper liability, the file is forwarded to the Naval Material Transportation Office, (NAVMTO), Norfolk, Virginia for offset action. (f) Direct Procurement Method (DPM). (1) A DPM move is a method in which the Government manages the shipment from origin to destination. Contracts are issued to commercial firms for packing, containerization, local drayage, and storage services, or Government facilities and employees provide these services. Separate arrangements are made with carriers and separate documents are issued for each segment throughout. DPM contractors are also known as packing and crating (P&C) contractors, as local drayage contractors, or just as local contractors. (2) GBL's for DPM shipments are usually only issued to motor freight carriers. (i) Block 3 on the GBL entitled “service code” will contain the letters A, B, H, or V, followed by a second letter A, H, K, N, P, R, W, X, or Y. These two letter codes identify the GBL as a DPM contract. (ii) Block 18, “consignee,” and Block 19, “from,” on the GBL contain the name and address of another carrier or transportation office rather than the name and address of the claimant. (iii) Block 27, “description of shipment,” on most GBL's contains the statement, “household goods released at a value of 10 cents per pound per article.” This refers to the motor freight carrier's liability only. The origin and destination contractors' liability is still $.60 per pound times the weight of the article or carton, as indicated in the Joint Military/Industry Table of Weights. (iv) If liability lies against the motor freight carrier, the term “article” is defined as the weight of each packed item, such as the weight of a broken dish within a carton rather than the net weight of a carton, as used against the origin and destination contractors. Liability is computed against the motor freight carrier at a rate of $.10 per pound times the weight of the article. (3) Since 1 January 1981 the destination contractor has been held liable for loss and damage unless it can prove that it is not at fault, i.e., took exceptions prior to receipt of goods. The motor freight carrier is liable for any damage or loss noted against it during its portion of the move. If the motor freight carrier has noted specific damage when it received the shipment, liability is charged against the origin contractor at $.60 per pound times the weight of the article or carton. Damage noted against the origin contractor or motor freight carrier should be indicated on a valid shipping document and generally involves distinct damage to or missing containers. These documents must be signed by all parties involved in the transfer of the goods. (4) The destination contractor must receive timely notice of loss or damage via DD Form 1840/1840R and a demand packet. If exceptions were taken against the origin contractor or motor freight carrier on a transfer document, they should receive only demand packets. (5) In determining destination or origin contractor's liability, the term “article” has been defined as each shipping carton or container and the contents thereof, less any exterior crate or shipping carton. The net weight of each article (carton or box) packed within the exterior crate or carton may be used to determine the contractor's liability for a damaged or missing item originating out of that carton. (6) Claims offices should obtain a copy of the DPM contract from the local contracting office or transportation office in order to identify which company has the DPM contract and verify the limits of the liability clause. Contracts are awarded on a calendar-year basis. (g) Mobile homes. Mobile home claims represent such a small percentage of claims received that claims personnel are often unfamiliar with the requirements and documentation necessary to process such claims. For an explanation of the adjudication of such claims and the forms used to effect shipment, see §751.12(g) above. (1) Carrier liability—(i) For damage to the mobile home. Carrier liability for damage to a mobile home is generally the full cost of repairs for damage incurred during transit. A mobile home carrier is excused from liability when the carrier can introduce substantial proof that a latent structural defect (one not detectable during the carrier's preliminary inspection) caused the loss or damage. (ii) For damage to contents. The carrier's liability for loss or damage to household or personal effects inside the mobile home (such as clothing and furniture. or furnishings which were not part of the mobile home at the time it was manufactured) is limited to $250.00 unless a greater value is declared in writing on the GBL. Under the Mobile Home One-Time-Only (MOTO) rate system, effective for shipments after 1 November 1987 the owner no longer prepares his own inventory. Under the MOTO system, the carrier in coordination with the owner is required to prepare a legible descriptive inventory on DD Form 1412, Inventory of Articles Shipped in House Trailer. (iii) Agents of the mobile home carrier. If the shipment is transferred to another mobile home carrier for transport, the first carrier will continue to be shown on the GBL and is responsible for the mobile home from pickup to delivery. The carrier is also responsible for damage caused by third parties it engages to perform services such as auxiliary towing and wrecking. (iv) Water damage. Water damage to a double-wide or expando-type mobile home is usually due to the carrier's failure to provide sufficient protection against an unexpected rainstorm. Carriers will often assert that this damage is due to an “act of God” and attempt to avoid liability. It is, however, the carrier's responsibility to ensure safe transit of the mobile home from origin to destination. Not only should carriers be aware of the risk of flash floods and storms in certain locales during certain seasons, but a carrier is supposed to provide protective covering over areas of the mobile home exposed to the elements. Carrier recovery should be pursued for water damage to these types of mobile homes. (v) Waivers signed by the claimant. The carrier may attempt to escape liability by having the owner execute a waiver of liability. Such waivers are not binding upon the United States. (vi) Extensions of storage in transit (SIT). The extension of SIT past 180 days is only applicable to household goods and holdbaggage shipments. It is not applicable to the shipment of mobile homes. If a mobile home remains in SIT past 180 days, storage is at the owner's expense. (2) Notice. Item 306 of the carrier's rate solicitation states that: “Upon delivery by the carrier, all loss of or damage to the mobile home shall be noted on the delivery document, the inventory form, the DD Form 1800, and/or the DD Form 1840. Late(r) discovered loss or damage, including personal property within the mobile home, will be noted on DD Form 1840R not later than 75 days following delivery and shall be accepted by the carrier as overcoming the presumption of correctness of delivery receipt.” Notification to the carrier may be made on any of the documents. Claims personnel will dispatch the DD Form 1840R in accordance with §751.14. (3) Preparation of demands. The carrier is liable for the full amount of substantiated damage to the mobile home itself (less estimate fees), plus up to $250.00 for loss or damage to contents (unless the claimant purchased increased released valuation on the contents). Prepare a demand for this amount. In addition to the DD Form 1843 and DD Form 1844, the demand packet should include the following documents: (i) DD Form 1800, Mobile Home Inspection Record; (ii) DD Form 1863, Assessorial Services, Mobile Home; (iii) DD Form 1840/1840R, Joint Statement of Loss or Damage at Delivery/Notice of Loss; (iv) DD Form 1412, Inventory of Items Shipped in House Trailer; (v) DD Form 1841, Government Inspection Report; (vi) Driver's statement, from the driver of the towing vehicle; (vii) Claimant's statement concerning previous moves; (viii) Estimates of repair, preferably two, from firms in the business of repairing mobile homes; and (ix) Engineer's statement, or statement by other qualified professionals. (4) References. Chapter 3 and Appendix E of DOD 4500.34–R, pertain to mobile home shipment and contain much valuable information. Another source is NAVSUP 490, Chapter 10 “Mobile Homes of Military Personnel.” (a) Carrier. When property is lost, damaged, or destroyed during shipment under a GBL pursuant to authorized travel orders, the claims investigating officer or adjudicating authority (whichever can more efficiently perform the task) shall file a written claim for reimbursement with the carrier according to the terms of the bill of lading or contract. This demand shall be made against the last carrier known to have handled the goods, unless the carrier in possession of the goods when the damage or loss occurred is known. In this event, the demand shall be made against the responsible carrier. If it is apparent the damage or loss is attributable to packing, storing or handling while in the custody of the Government, no demand shall be made against the carrier. (b) Marine Corps claimants. For Marine Corps claimants, the claims investigating officer will prepare the claim against the carrier, contractor, and/or insurer and will mail it (together with the DD Form 1842 claim package) to the Commandant of the Marine Corps (MHP–40), who will submit and assume the responsibility of monitoring the claim against the carrier. (c) NTS warehousemen. Whenever property is lost, damaged, or destroyed while being stored under a basic agreement between the Government and the warehouseman, the claims investigating officer, or appropriate Naval Legal Service Command (NLSC) activity, shall file a written claim for reimbursement with the warehouseman under the terms of the storage agreement. (d) Insurer. When the property lost, damaged, or destroyed is insured, the claimant must make a demand against the insurer for payment under the terms of the insurance coverage within the time provided in the policy. If the amount claimed is clearly less than the policy deductible, no demand need be made. Failure to pursue a claim against available insurance will result in reducing the amount paid on the claim by the amount which could have been recovered from the insurer. When an insurer makes a payment on a claim in which the Government has made a recovery against the carrier or contractor, the insurer shall be reimbursed a pro rated share of any money recovered. Demand on a carrier or contractor shall be made in writing on DD Form 1843 (Demand on Carrier) with a copy of the adjudicated DD Form 1844 (Schedule of Property) attached. (a) Demand packets. A demand is a monetary claim against a carrier, contractor, or insurer, to compensate for loss or damage incurred to personal property during shipment or storage. DD Form 1843 represents the actual demand. The demand packet is a group of documents, stapled together and sent to the liable third party. More than one demand packet should be prepared when more than one party is deemed to be liable. Do not use original documents. Demand packets should be mailed in official DON envelopes. No demand packet should be prepared for claim files that have been closed or when potential recovery is $25.00 or less. In those cases the outside of file folders in the upper left-hand corner should be marked “CLOSED.” A demand packet will include the following: (1) DD Form 1843, Demand on Carrier/Contractor; (2) DD Form 1844, Schedule of Property and Claim Analysis Chart; (3) DD Form 1841, Government Inspection Report (if available); (4) DD Form 1164, Service Order for Personal Property (when applicable); (5) Copies of all repair estimates (translated from foreign languages); and (6) Copies of all other supporting documents deemed appropriate. (b) Dispatch of demand packets. (1) The demand packets are directly dispatched by the appropriate personal property office or the Naval Legal Service Office to the third party. (2) Privately Owned Vehicles (POV's). Demands for loss or damage to POV's will not be made directly against ocean carriers operating under contract with the MSC. After payment is made to the claimant, one copy of the complete claim file will be forwarded directly to Commander, MSC. Each file shall include the following: (i) The payment voucher; (ii) The completed personnel claim forms; (iii) The estimated or actual cost of repair; (iv) A document indicating the conditions of the items upon delivery to the carrier; and (v) a document indicating the forwarding condition of the POV upon its return to Government control. The letter of transmittal should identify the vessel by name, number, and if available, the sailing date. The claimant shall assign to the Government, to the extent of any payment made on the claim, all rights and interest the claimant may have against any contractor, carrier, or insurer or other party arising out of the incident on which the claim is based. The claimant shall also furnish such evidence as may be required to enable the Government to enforce its claim. If the claimant refuses to cooperate, steps may be taken to ensure return of monies paid on the item which the Government is trying to collect. (a) Recoveries. If a claimant receives payment from the Government under this instruction and also receives compensation from a carrier, contractor, or insurer for the same loss, the Government shall collect from the claimant the amount necessary to prevent the claimant from being compensated twice for the same loss. If the amount payable on a claim is less than the adjudicated value of the claim, excess recoveries from carriers, and other third parties shall be paid to the member as long as the total amount paid does not exceed the value of the claim as adjudicated. (b) Recovered property. When lost property is found, the claimant may, at his option, accept all or part of the property and return the full payment or a pro-rated share of the payment received from the Government on the claim for the recovered property. Surrendered property shall be disposed of under applicable salvage and disposal procedures. (a) Settlement procedures. In the interest of expeditious office administration, correspondence to carriers and contractors should be kept to a minimum. Normally, one rebuttal to a third party's denial of liability is sufficient, unless the carrier or contractor raises new arguments or provides new information. (1) Checks from third parties. Accept checks for the amount demanded from carriers and contractors. If a carrier or contractor forwards a check for less than the amount demanded, review the carrier's arguments for reducing liability to determine if they are acceptable. If the third party's basis for reducing liability is acceptable in the light of all evidence, deposit the check and dispatch the unearned freight letter, if applicable. Mark the front upper left-hand corner of the file as “CLOSED.” (2) Third party offers of settlement. If a carrier or contractor offers to settle the claim, review the carrier's arguments for reducing liability to determine if they are acceptable. If the third party's basis for reducing liability is acceptable in light of all evidence, inform the carrier that the offer is accepted, but that offset action will be initiated if a check for that amount is not received within 45 days. If a check in the amount acceptable to the Government is received, deposit it and dispatch the unearned freight letter, if applicable. Mark the front upper left-hand corner of the file as “CLOSED.” If a check in the proper amount is not received within 45 days, send the request to NAVMTO, Norfolk (or appropriate contract officer) for offset action (see §751.32 of this part). (3) Unacceptable third party checks and offers of settlement. If a third party's basis for denying liability is not valid, respond to that carrier or contractor. Return unacceptable checks. Explain the reasons for not accepting the check or offer, and request the amount that is justified under the circumstances in the light of all the evidence. If a release was included, amend the release to the revised amount and sign, date, witness, and return it. Warn the carrier or contractor that the claim will be forwarded for offset action if a check for the amount justified under the circumstances is not received within 45 days. Suspend the file for 45 days and if a check in the proper amount is received, deposit it and dispatch the unearned freight letter, if applicable. If a check in the proper amount is not received within 45 days, request NAVMTO, Norfolk (or appropriate contract officer) to take offset action. (4) Third party denials of liability. Upon receipt, review the carrier or contractor's basis for denying liability in the light of all the evidence. (i) Acceptable third party reasons for denial. Mark the front upper left-hand corner of such files as “CLOSED.” (ii) Partially acceptable and unacceptable third party reasons for denial. If the carrier or contractor's basis for denying liability is acceptable only in part or is completely unacceptable, follow the procedures in subparagraph (3) above, requesting the amount that is justified under the circumstances in the light of all the evidence. If a response is not received within 45 days, or if the third party's reply is not responsive, request NAVMTO, Norfolk (or appropriate contract officer) take offset action as described above. (b) Depreciation. In determining payments to claimants, the depreciation rates from the Allowance List—Depreciation Guide are used. In determining third party liability, however, a different depreciation guide, the Joint Military/Industry Depreciation Guide is used instead. In most instances, the depreciation rates are the same in both guides, and claims personnel are not required to consult the Joint Military/Industry Depreciation Guide or alter the depreciation taken on items prior to dispatching demands. If, however, a carrier or contractor objects to the depreciation rate utilized for certain items, consult the Joint Military/Industry Depreciation Guide and use the depreciation rate found in that guide if it differs from the rate in the Allowance List-Depreciation Guide. The following are common reasons given for denial of an entire claim, or for individual items on a claim. Each reason for denial is followed by a short discussion of the validity of such a denial. (a) The carrier alleges that valid exceptions were made at the time of pickup from the NTS facility. When a carrier provides an exception sheet it contends was made at time of transfer, this exception sheet must bear the signature of a representative of the NTS facility. Without a signed exception sheet there is no evidence that the NTS facility was made aware of these exceptions and given the opportunity to confirm or deny the alleged condition of the items in question. The burden of proof is on the carrier to provide the valid exception sheet and establish its freedom from liability. (b) The carrier denies liability for missing or damaged item packed in cartons because it did not pack the shipment and the cartons did not show outside damage. When a carrier accepts a shipment in apparent good order, it is responsible for damage to packed items, unless it can prove that the packing was improper and was the sole cause of the damage. (c) The carrier contends that the mildew damage occurred in NTS and not during its transport of the shipment. Mildew formation is more likely to occur in NTS than in transport. Unsupported by evidence, however, an allegation that mildew formation occurred during NTS does not rebut the established prima facie case of a carrier liability. A carrier must prepare an exception sheet and note any mold or mildew damage when the items were picked up from the NTS facility. The burden of proof is on the carrier to show that it was free from negligence and that the damage was due solely to the formation of mildew or mold during the NTS storage. (d) The carrier claims that damage is due to “inherent vice.” Although the carrier may allege that damage was due to “inherent vice,” the mere allegation of “inherent vice” is insufficient to relieve the carrier of liability. The burden of proof is on the carrier to establish that an “inherent vice” existed and that it was the sole cause of the damage claimed. Since the carrier can rarely establish this burden of proof, denial due to “inherent vice” is seldom acceptable. (e) The carrier contends that it was denied the right to inspect. Often a carrier will state that it made several attempts to make an inspection, but the shipper failed to keep the appointment. If such a case exists, the proper procedure for the carrier to follow is to contact the claims office for assistance in accomplishing the inspection within a timely manner. A carrier's efforts to obtain the inspection should be documented in the file by claims personnel. Lack of an inspection alone, however, does not relieve the carrier of liability and is insufficient to rebut a well-established prima facie case of liability. (f) The carrier denies liability on missing items because the items do not appear on the new inventory made at pickup from the NTS facility. When a carrier picks up a shipment from NTS and chooses to prepare a new inventory, it must use identical or cross-referenced numbers. If an article such as a chair or a lawnmower is missing, it must be indicated as “missing” on the new inventory. Whether or not a new inventory is made, an exception sheet must be prepared and the missing articles must be noted thereon. To relieve the carrier of liability, both the new inventory and the exception sheet must be signed by representatives of the NTS facility and the carrier. (g) The carrier denies liability due to “act of God.” An act of God is an event that could not have been prevented by human prudence. It is generally seen as an occurrence in which human skill or watchfulness could not have foreseen the disaster. The burden of proof is on the carrier to establish that an “act of God” existed and that it was the sole cause of the damage claimed. Since the carrier can rarely establish this burden of proof, denial due to an “act of God” is generally not acceptable. The carrier cannot avoid liability if it has been negligent in exposing the goods to potential danger or if it failed to take reasonable steps to reduce the extent of the injury once the danger was discovered. (h) The carrier contends that the claimant's repair estimate is excessive and that its own repair firm can do the job cheaper. A claimant has the right to select a repair firm provided the cost is reasonable and not in excess of the item's value. The carrier is liable for the reasonable cost of repairing damaged merchandise that includes labor, material, overhead, and other incidental expenses incurred in reconditioning or putting the goods in salable condition. If the carrier did not provide the claims office with an acceptable, lower estimate to use in adjudicating the claim, and if the claimant's estimate is reasonable, then the carrier is liable for the amount paid the claimant. (i) The carrier contends that liability should have been predicated on the agreed weight of a sofa and not a hide-a-bed. This argument only applies when carrier liability is based on weight. At the time the inventory is prepared, the carrier's driver must establish whether a sofa is merely a sofa, or one that converts into a bed. Failure to properly identify the item on the inventory does not relieve the carrier of liability for the greater weight of a sofa bed. (j) The carrier argues that it is not responsible for warpage, rust, etc., due to climatic changes. This argument does not relieve a carrier of liability unless the carrier offers substantial evidence to show that the damages resulted solely from unusual circumstances beyond its control, as with an “act of God,” or that it occurred while the property was in the hands of another contractor, as reflected upon a valid NTS exception sheet. The burden of proof is on the carrier to establish that the damage was not due to its negligence and that circumstances beyond its control were the sole cause of the loss. Because the carrier can rarely establish this, denial due to “climatic changes” is rarely acceptable. (a) General. Claim files are forwarded with a recommendation for offset action when 120 days have passed since a demand and a response has not been received from the carrier or contractor. Files are also forwarded for offset action when an impasse is reached. An impasse occurs when legitimate efforts to collect the fully justified amount demanded have reached a standstill and the carrier has no valid basis for denial. Prior to forwarding files for offset action, claims personnel must ensure that timely notice has been given, that all necessary documents are included, and that the demand and any correspondence were mailed to the proper carrier or contractor at its correct address. When applicable, claims personnel must also ensure that an unearned freight packet is included. (b) Claim files forward to local contracting offices. Claims forwarded to local contracting offices for offset action include claims involving local moves and DPM shipments in which the origin and/or destination contractor is determined to be liable. When the contractor fails to reply to a demand within 120 days or fails to make an acceptable offer, the file should be forwarded to the local contracting office with a request for offset action. (c) Unjustified denials and inadequate settlement offers by carrier or contractor—(1) GBL carriers. If a GBL carrier or insurer has refused to acknowledge or respond to a demand within a reasonable time (usually 30 days), if the claims investigating officer considers a valid claim to have been denied or not adequate settlement offered, or if settlement has been delayed beyond 120 days (see §751.32(a)), the claim shall be forwarded to the NLSC activity serving the geographical location recommending that set-off action be taken against the carrier or contractor. The 120-day period begins to run on the date initial demand is made on the carrier. The NLSC activity shall review the file and if the carrier liability is correctly computed, forward a copy of the GBL, copies of the DD Forms 1843 and 1844, SCAC code, and final demand on carrier to the Commanding Officer, Naval Material Transportation Office, Code 023, Bldg. Z–133–5, Naval Station, Norfolk, VA 23511 directing set-off action against the carrier or contractor. (2) Nontemporary warehousemen. If a warehouseman or insurer has refused to acknowledge or respond to a claim within a reasonable time, if the claims investigating officer considers a valid claim to have been denied or no adequate settlement offered, or if settlement has been delayed beyond 120 days, the claim shall be referred to the NLSC activity serving the geographic location recommending set-off action be taken against the contractor. The 120-day time period begins to run on the date the initial demand was made. The NLSC activity shall review the file and if the warehouseman's liability is correctly computed, forward the file to the appropriate MTMC Regional Storage Management Office for set-off. (a) Preparation. An unearned freight packet should be prepared when the loss or destruction of an item in shipment is attributable to a GBL carrier. Unearned freight packets should be addressed to the carrier, and not to the agents of GBL carriers, NTS contractors, or other contract movers. An unearned freight packet is required when a mobile home is lost or completely destroyed. An unearned freight packet includes: (1) A Request For Deduction of Unearned Freight Charges; (2) A copy of DD Form 1843; (3) A copy of DD Form 1844; and (4) A copy of the GBL. (b) Dispatch. The unearned freight packet is not dispatched to the NAVMTO, Norfolk until the carrier has paid its agreed liability or when offset has been accomplished. (a) General. Sections 1 through 12 and 52 through 65 of Title 4, GAO Manual, Policy and Procedures Manual for Guidance of Federal Agencies, and 4 CFR parts 30–32 set forth procedures for carriers to appeal setoff action. Before a carrier can appeal a setoff action to GAO, the command requesting setoff action must make an administrative report to GAO. (b) Procedures for appeals. (1) The carrier must request appeal from the command requesting setoff action and request a GAO review. (2) The command requesting setoff action will review the appeal and if it is determined the setoff action was appropriate, will do an administrative report and notify the carrier when this has been accomplished. (3) The administrative report and complete claims file will be forwarded to the NLSC activity serving the geographic location for review prior to forwarding to GAO. (4) The complete claims package, including all correspondence with the carrier, will then be forwarded to GAO. (c) The administrative report and enclosures must support the setoff action. (d) GAO Manual. All NLSC activities have been provided a copy of a manual published by the Claims Group General Government Division, U.S. General Accounting Office entitled Procedures of the U.S. General Accounting Office for Household Goods Loss and Damage Claims. Other commands dealing with carrier recoveries should get a copy of the manual from the NLSC activity servicing the local area. Copies of all of the forms and instructions discussed in this part may be obtained if needed, from the Commanding Officer, Naval Publications and Forms Center, 5801 Tabor Avenue, Philadelphia, PA 19120.
Title 32: National Defense
PART 751—PERSONNEL CLAIMS REGULATIONS
Subpart B—Demand On Carrier, Contractor, or Insurer
§ 751.21 Scope of subpart B.
§ 751.22 Carrier recovery: In general.
§ 751.23 Responsibilities.
§ 751.24 Notice of loss or damage.
§ 751.25 Types of shipments and liability involved.
§ 751.26 Demand on carrier, contractor, or insurer.
§ 751.27 Preparation and dispatch of demand packets.
§ 751.28 Assignment of claimants rights to the government.
§ 751.29 Recoveries from carrier, contractor, or insurer.
§ 751.30 Settlement procedures and third party responses.
§ 751.31 Common reasons for denial by carrier or contractor.
§ 751.32 Forwarding claims files for offset action.
§ 751.33 Unearned freight packet.
§ 751.34 GAO appeals.
§ 751.35 Forms and instructions.

