33 C.F.R. PART 154--FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK
TITLE 33--Navigation and Navigable Waters
CHAPTER I--COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
SUBCHAPTER O--POLLUTION
PART 154--FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK
Subpart A--GENERAL
|
|
| Incorporation by reference.
|
|
Subpart B--OPERATIONS MANUAL
|
|
| Operations manual: General.
|
|
|
|
| Operations manual: Contents.
|
|
|
|
| Operations manual: Amendment.
|
|
|
|
| Operations manual: Procedures for examination.
|
|
Subpart C--EQUIPMENT REQUIREMENTS
|
|
| Small discharge containment.
|
|
|
|
| Discharge containment equipment.
|
|
Subpart D--FACILITY OPERATIONS
|
|
| Persons in charge: Designation and qualification.
|
|
|
|
| Persons in charge: Evidence of designation.
|
|
|
|
| Compliance with operations manual.
|
|
Subpart E--VAPOR CONTROL SYSTEMS
|
|
| Review, certification, and initial inspection.
|
|
|
|
| Application for acceptance as a certifying entity.
|
|
|
|
| Vapor control system, general.
|
|
|
|
| Facility requirements for vessel liquid overfill protection.
|
|
|
|
| Facility requirements for vessel vapor overpressure and vacuum protection.
|
|
|
|
| Fire, explosion, and detonation protection.
|
|
|
|
| Detonation arresters, flame arresters, and flame screens.
|
|
|
|
| Inerting, enriching, and diluting systems.
|
|
|
|
| Vapor compressors and blowers.
|
|
|
|
| Vapor recovery and vapor destruction units.
|
|
|
|
| Operational requirements.
|
|
Subpart F--RESPONSE PLANS FOR OIL FACILITIES
|
|
| Facility classification by COTP.
|
|
|
|
| Response plan submission requirements.
|
|
|
|
| Operating restrictions and interim operating authorization.
|
|
|
|
| Qualified individual and alternate qualified individual.
|
|
|
|
| Methods of ensuring the availability of response resources by contract or other approved means.
|
|
|
|
| General response plan contents.
|
|
|
|
| Specific requirements for facilities that could reasonably be expected to cause significant and substantial harm to the environment.
|
|
|
|
| Specific requirements for facilities that could reasonably be expected to cause substantial harm to the environment.
|
|
|
|
| Specific response information to be maintained on mobile MTR facilities.
|
|
|
|
| Response plan development and evaluation criteria for facilities that handle, store, or transport Group I through Group IV petroleum oils.
|
|
|
|
| Response plan development and evaluation criteria for facilities that handle, store, or transport Group V petroleum oils.
|
|
|
|
| Inspection and maintenance of response resources.
|
|
|
|
| Submission and approval procedures.
|
|
|
|
| Plan review and revision procedures.
|
|
Subpart G--ADDITIONAL RESPONSE PLAN REQUIREMENTS FOR A TRANS-ALASKA PIPELINE AUTHORIZATION ACT (TAPAA) FACILITY OPERATING IN PRINCE WILLIAM SOUND, ALASKA
|
|
| Purpose and applicability.
|
|
|
|
| Operating restrictions and interim operating authorization.
|
|
|
|
| Additional response plan requirements.
|
|
|
|
| Requirements for prepositioned response equipment.
|
|
|
|
| Response plan development and evaluation criteria.
|
|
|
|
| TAPAA facility contracting with a vessel.
|
|
Subpart H--RESPONSE PLANS FOR ANIMAL FATS AND VEGETABLE OILS FACILITIES
|
|
| Purpose and applicability.
|
|
|
|
| Response plan submission requirements.
|
|
|
|
| Specific response plan development and evaluation criteria and other requirements for fixed facilities that handle, store, or transport animal fats or vegetable oils.
|
|
|
|
| Methods of ensuring the availability of response resources by contract or other approved means.
|
|
|
|
| Specific requirements for animal fats and vegetable oils facilities that could reasonably be expected to cause substantial harm to the environment.
|
|
Subpart I--RESPONSE PLANS FOR OTHER NON-PETROLEUM OIL FACILITIES
|
|
| Purpose and applicability.
|
|
|
|
| Response plan submission requirements.
|
|
|
|
| Response plan development and evaluation criteria for facilities that handle, store, or transport other non-petroleum oils.
|
|
|
|
|
Appendix C to Part 154--Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans
|
|