43 C.F.R. § 418.12   Project efficiency.


Title 43 - Public Lands: Interior


Title 43: Public Lands: Interior
PART 418—OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA
Conditions of Water Delivery

Browse Previous |  Browse Next

§ 418.12   Project efficiency.

(a) The principal feature of this part is to obtain a reasonable level of efficiency in supplying water to the headgate by the District. The efficiency targets established by this part are the cornerstone of the enforcement and the incentive provisions and when implemented will aid other competing uses.

(b) The efficiency is readily calculable at the year's end, readily applicable to water appropriate to that year, able to be compared to other irrigation systems even though there may be many dissimilarities, appropriate for long term averaging, adjustable to any headgate delivery level including droughts or allocations, automatically adjusts to changes during the year and accurately accounts for misappropriated water. Efficiency also can be achieved through any number of measures from operations to changes in the facilities and can be measured as an end product without regard to the approach. Thus it is flexible enough to allow local decision making and yet is fact based to minimize disputes.

(c) Assuming the headgate deliveries are valid and enforceable, conveyance efficiency is the only remaining variable in determining the quantity of water needed to be supplied to the District. Conveyance efficiency is a measure of how much water is released into the irrigation system relative to actual headgate deliveries. Differences in efficiency, therefore, are directly convertible to acre-feet. The differences in efficiency, expressed as a quantity in acre-feet, may be added to or subtracted from the actual Lahontan Reservoir storage level before it is compared to the monthly storage objective. Thus, the diversions from the Truckee River, operation of other facilities (e.g., Stampede Reservoir) and decisions related to Lahontan Reservoir are made after the efficiency storage adjustments have been made. Operating decisions are made as if the adjusted storage reflected actual conditions.

(1) Efficiency incentive credits. In any year that the District's actual efficiency exceeds the target efficiency for the actual headgate delivery, two-thirds of the resultant savings, in water, will be credited to the District as storage in Lahontan. This storage amount will remain in Lahontan Reservoir as water available to the District to use at its discretion consistent with Nevada and Federal law. Such uses may include wetlands (directly or incidentally), power production, recreation, a hedge against future shortages or whatever else the District determines. The storage is credited at the end of the irrigation season from which it was earned. This storage “floats” on top of the reservoir so that if it is unused it will be spilled first if the reservoir spills. The District may use all capacity of Lahontan Reservoir not needed for project purposes to store credits.

(2) Efficiency disincentive debits. In any year that the District's actual efficiency falls short of the target appropriate to the actual headgate deliveries, then the resultant excess water that was used is considered borrowed from the future. Thus it becomes a storage debit adjustment to the actual Lahontan Reservoir storage level for determining all operational decisions. The debit may accumulate but may not exceed a maximum as defined in §418.13(b). The debit must be offset by an existing incentive credit or, if none is available, by a subsequent incentive at a full credit (not a 2/3 credit), or finally by a restriction of actual headgate deliveries by the District. This would only be done prospectively (a subsequent year) so the District and the water users can prepare accordingly. Since the debit does not immediately affect other competing uses or the District (except in a real drought), it allows for future planning and averaging over time.

(3) Efficiency targets. To determine the efficiency target, the system delivery losses were divided into categories such as seepage, evaporation and operational losses. The “reasonable” level of savings for each category was then determined by starting with current operating experience and applying the added knowledge from several measures. Means of achieving the efficiency targets, including the specific conservation measures and amounts, are identified in the table Possible Water Conservation Measures for the Newlands Project. Applicable target efficiencies will be determined each year as described in §418.13 (a)(4).

(4) Available conservation measures. The water conservation measures referred to in paragraph (c)(3) of this section and others currently available to the District are listed in the following table. The table has been revised based upon the Bureau of Reclamation's Final Report to Congress of the Newlands Project Efficiency Study, 1994.

      Possible Water Conservation Measures for the Newlands Project------------------------------------------------------------------------                              Expected savings  Conservation measures\1\    in acre-feet (AF)           Notes                                 per year\2\------------------------------------------------------------------------1. Water ordering            1,000               Require 48-hour advance                                                  notice.2. Adjust Lahontan Dam       ++\3\               Match releases to releases frequently                              demand with daily                                                  adjustments.3. Increase accuracy of      12,000              Account for deliveries delivery records and                             to nearest cfs and to measurement devices                              nearest minute.4. Change operation of       ??\4\               Eliminate use of all or regulating reservoirs                            parts of regulating                                                  reservoirs; drain at                                                  end of season.5. Shorten irrigation        4,000               Reduce by 2 weeks. season6. Control delivery system   ++                  Eliminate spills,                                                  better scheduling,                                                  grouping deliveries.7. System improvements       ??                  O&M activity:                                                  repair leaky gates,                                                  reshape canals,                                                  improve measuring                                                  devices.8. Dike off 2/3 S-Line       2,720               500 ft. dike; (5[foot] Reservoir                                        evaporation,                                                  0.75[foot] seepage).9. Dike off south half of    2,130               5,000 ft. dike; large Harmon Reservoir                                 savings considering                                                  canal losses (5[foot]                                                  evap., 1.8[foot]                                                  seepage).10. Dike off west half of    2,400               6,000 ft. dike. Sheckler Reservoir11. Eliminate use of         4,000               Use for Lahontan spill Sheckler Reservoir                               capture only; restore                                                  200 ft. of E-Canal; A-                                                  Canal is OK.12. Line 20 miles of         20,000              Reduces O&M. Truckee Canal\5\13. Line large canals        26,100-31,000       Line large net losers                                                  first.14. Line regulatory          2.3 AF/acre reservoirs15. Reuse drain water for    7,100               Assuming blended water irrigation                                       quality would be                                                  adequate16. Ditch rider training     ?? each year17. Canal automation         ??                  Reduced canal                                                  fluctuations.18. Community rotation       ??                  Grouping deliveries by system                                           area.19. Reclamation Reform Act   ??                  District implementation water conservation plan:                         of water conservation                                                  plan.    a. Weed and     phreatophyte control    b. Fix gate leaks    c. Water measurement    d. Automation    e. Communication20. Pumps and wells for      400 small diverters21. Water pricing by amount  ++                  Incurs administrative used                                             costs to implement.22. Incentive programs       ??                  For District personnel                                                  and/or water users.23. Drain canals             1,065               At the end of each                                                  irrigation season.24. Acquire parcels with     22,280              Acquire and retire inefficient delivery\6\                          water rights from                                                  irrigated acreage with                                                  particularly                                                  inefficient delivery.                                                  Lesser savings from                                                  transferring water                                                  rights to lands with                                                  more efficient                                                  delivery.------------------------------------------------------------------------\1\The first seven measures were considered in developing the water  budget in Table 1 for the 1988 OCAP. Additional measures could be  implemented by the District to help achieve efficiency requirements.\2\Water savings have been updated in accordance with Bureau of  Reclamation's Report to Congress on Newlands Project Efficiency, April  1994.\3\++ indicates a positive number for savings but not quantifiable at  this time.\4\?? indicates uncertainty as to savings.\5\This measure was included in the 1988 OCAP and effects overall  Project efficiency; it is recognized that savings from this measure  are not accounted for in the OCAP.\6\Identified in the 1994 BOR Efficiency Study: 31 Corporation, below  Sagouspe Dam, and N Canal.

(5) The measures in paragraph (c)(4) of this section are discretionary choices for the District. The range of measures available to the District provides a level of assurance that the target efficiency is reasonably achievable. The resultant efficiency targets were also compared to the range of efficiencies actually experienced by other irrigation systems that were considered comparable in order to provide a further check on “reasonable.” Most of the delivery losses are relatively constant regardless of the amount of deliveries. The efficiency will necessarily vary with the amount of headgate deliveries.

(6) The target efficiency for any annual valid headgate delivery can be derived from the table in Appendix A to this part.

Browse Previous |  Browse Next

chanrobles.com