43 C.F.R. PART 418--OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA
TITLE 43--Public Lands: Interior
Subtitle B--REGULATIONS RELATING TO PUBLIC LANDS
CHAPTER I--BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR
PART 418--OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA
|
How Project water may be used.
|
|
|
Effect of these regulations on water rights.
|
|
|
Responsibility for violations.
|
|
|
Fallon Paiute-Shoshone Indian Reservation.
|
|
|
Who may receive irrigation deliveries.
|
|
|
Reporting changes in eligible land.
|
|
|
Determining the amount of water duty to be delivered.
|
|
|
Valid headgate deliveries.
|
|
|
Maximum allowable limits.
|
|
|
Recordkeeping requirements.
|
|
|
Using water for power generation.
|
|
|
Truckee and Carson River water use.
|
|
|
Diversions from the Truckee River to the Truckee Division.
|
|
|
Diversions from the Truckee River to Lahontan Reservoir, January through June.
|
|
|
Diversion of Truckee River water to Lahontan Reservoir, July through December.
|
|
|
Future adjustments to Lahontan Reservoir storage targets.
|
|
|
Diversion of Rock Dam Ditch water.
|
|
|
Precautionary drawdown and spills from Lahontan Reservoir.
|
|
|
Water use for other than Newlands Project purposes.
|
|
|
Distribution system operation.
|
|
|
Provisions required in future contracts.
|
|
|
Purpose of the implementation strategy.
|
|
|
Valid headgate deliveries.
|
|
|
Incentives for additional long term conservation.
|
|
|
Disincentives for lower efficiency.
|
|
|
Maximum allowable diversion.
|
|