(a) The grantee may not advertise for bids or award a contract for any part of construction or major renovation funded by grant funds until the grantee has submitted to the responsible HHS official final working drawings and written specifications for the project, a written certification by a licensed engineer or architect as to technical appropriateness of the proposed construction or renovation and the conformity of the project as shown in the final working drawings and specifications with Head Start programmatic requirements, and a written estimate of the costs of the project by a licensed architect or engineer. (b) The responsible HHS official may authorize the grantee to advertise bids or award a contract after receiving the information provided under paragraph (a) of this section and determining that sufficient funding is, or will be, available to cover the costs of the project as estimated by the architect or engineer, and that the scope of the project as described in the drawings and specifications is appropriate to the needs of the grantee. (a) All facility construction and major renovation transactions must comply with the procurement procedure in 45 CFR parts 74 or 92, and must be conducted in a manner to provide, to the maximum extent practical, open and free competition. (b) All contracts for construction or major renovation of a facility to be paid for in whole or in part with Head Start funds require the prior, written approval of the responsible HHS official and shall be on a lump sum fixed-price basis. (c) Prior written approval of the responsible HHS official is required for unsolicited modifications that would change the scope or objective of the project or would materially alter the costs of the project by increasing the amount of grant funds needed to complete the project. (d) All construction and major renovation contracts for facilities acquired with grant funds shall contain a clause stating that the responsible HHS official or his or her designee shall have access at all reasonable times to the work being performed pursuant to the contract, at any stage of preparation or progress, and require that the contractor shall facilitate such access and inspection. (a) The grantee must provide and maintain competent and adequate architectural or engineering inspection at the work site to insure that the completed work conforms to the approved plans and specifications. (b) The grantee must submit a final architectural or engineering inspection report of the facility to the responsible HHS official within 30 calendar days of substantial completion of the construction or renovation. Construction and renovation projects and subcontracts financed with funds awarded under the Head Start program are subject to the Davis-Bacon Act (40 U.S.C. 276a et seq.) and the Regulations of the Department of Labor, 29 CFR part 5. The grantee must provide an assurance that all laborers and mechanics employed by contractors or subcontractors in the construction or renovation of affected Head Start facilities shall be paid wages at not less than those prevailing on similar construction in the locality, as determined by the Secretary of Labor.
Title 45: Public Welfare
PART 1309—HEAD START FACILITIES PURCHASE, MAJOR RENOVATION AND CONSTRUCTION
Subpart F—Construction and Major Renovation
§ 1309.51 Submission of drawings and specifications.
§ 1309.52 Procurement procedures.
§ 1309.53 Inspection of work.
§ 1309.54 Davis-Bacon Act.