46 C.F.R. § 32.50-5 Cargo pump gauges on tank vessels constructed on or after November 10, 1936—TB/ALL.
Title 46 - Shipping
(a) [Reserved] (b) A pressure gage shall be installed for each pump discharge, and it shall be located at a point visible with respect to the pump controls. [CGFR 65–50, 30 FR 16671, Dec. 30, 1965, as amended by CGD 73–254, 40 FR 40163, Sept. 2, 1975]
Title 46: Shipping
PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS
Subpart 32.50—Pumps, Piping, and Hose for Cargo Handling
§ 32.50-5 Cargo pump gauges on tank vessels constructed on or after November 10, 1936—TB/ALL.