46 C.F.R. PART 32--SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS
TITLE 46--Shipping
CHAPTER I--COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
SUBCHAPTER D--TANK VESSELS
PART 32--SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS
Subpart 32.01--GENERAL
|
|
| Incorporation by reference.
|
|
Subpart 32.02--SAFETY REQUIREMENTS
|
|
| Communication between deckhouses--TB/OCLB.
|
|
|
|
| Guards at dangerous places--TB/ALL.
|
|
Subpart 32.05--MARKINGS
|
|
| Draft marks and draft indicating systems--TB/ALL.
|
|
|
|
| Vessel's name on equipment--TB/ALL.
|
|
|
|
| Name of tank barge--B/ALL.
|
|
Subpart 32.15--NAVIGATION EQUIPMENT
|
|
| Sounding machines--T/OCL.
|
|
|
|
| Anchors, Chains, and Hawsers--TB/ALL
|
|
|
|
| Magnetic Compass and Gyrocompass--T/OC.
|
|
Subpart 32.16--NAVIGATION BRIDGE VISIBILITY
|
|
| Navigation bridge visibility-T/ALL.
|
|
Subpart 32.20--EQUIPMENT INSTALLATIONS
|
|
| Equipment installations on vessels during World War II--TB/ALL.
|
|
|
|
| Pressure vacuum relief valves--TB/ALL.
|
|
|
|
| Liquid level gaging--T/ALL.
|
|
Subpart 32.25--GENERAL ALARM SYSTEMS
|
|
| General alarm systems for tankships and manned tank barges.
|
|
Subpart 32.30--SOUND POWERED TELEPHONE, VOICE TUBE, AND ENGINE ORDER TELEGRAPH SYSTEMS
|
|
| Voice tubes or telephone equipment--T/ALL.
|
|
|
|
| Engine order telegraph equipment--T/ALL.
|
|
Subpart 32.35--MAIN AND AUXILIARY MACHINERY
|
|
| Boilers and machinery--TB/ALL.
|
|
|
|
| Installation of internal combustion engines--TB/ALL.
|
|
|
|
| Steering apparatus on tank vessels--TB/ALL.
|
|
|
|
| Installation of air compressors on tank vessels contracted for on or after June 15, 1977--TB/ALL.
|
|
Subpart 32.40--ACCOMMODATIONS FOR OFFICERS AND CREW
|
|
| Location of crew spaces--T/ALL.
|
|
|
|
| Sleeping accommodations--T/ALL.
|
|
|
|
| Washrooms and toilet rooms--T/ALL.
|
|
|
|
| Heating and cooling--T/ALL.
|
|
|
|
| Crew accommodations on tankships of less than 100 gross tons and manned tank barges--TB/ALL.
|
|
|
|
| Crew accommodations on tankships constructed before June 15, 1987--T/ALL.
|
|
Subpart 32.45--ELECTRICAL INSTALLATIONS
|
|
| Installation and details.
|
|
Subpart 32.50--PUMPS, PIPING, AND HOSE FOR CARGO HANDLING
|
|
| Cargo pumps for tank vessels constructed on or after November 10, 1936--TB/ALL.
|
|
|
|
| Cargo pump gauges on tank vessels constructed on or after November 10, 1936--TB/ALL.
|
|
|
|
| Cargo pumps on tank vessels with independent cargo tanks which were constructed prior to November 10, 1936--TB/ALL.
|
|
|
|
| Cargo piping on tank vessels constructed on or after July 1, 1951--TB/ALL.
|
|
|
|
| Cargo piping for tank vessels constructed between November 10, 1936, and July 1, 1951--TB/ALL.
|
|
|
|
| Cargo pumps and piping on tank vessels constructed prior to November 10, 1936--TB/ALL.
|
|
|
|
| Remote manual shutdown for internal combustion engine driven cargo pump on tank vessels--TB/ALL.
|
|
Subpart 32.52--BILGE SYSTEMS
|
|
| Bilge pumps on tank vessels constructed or converted on or after November 19, 1952--TB/ALL.
|
|
|
|
| Bilge piping for pump rooms and adjacent cofferdams on tank vessels constructed or converted on or after November 19, 1952--TB/ALL.
|
|
|
|
| Bilge pumps and piping on tank vessels constructed or converted prior to November 19, 1952--TB/ALL.
|
|
Subpart 32.53--INERT GAS SYSTEM
Subpart 32.55--VENTILATION AND VENTING
|
|
| Ventilation of tank vessels constructed on or after July 1, 1951--TB/ALL.
|
|
|
|
| Ventilation of tank vessels constructed between November 10, 1936, and July 1, 1951--TB/ALL.
|
|
|
|
| Ventilation of tank vessels contracted prior to November 10, 1936--TB/ALL.
|
|
|
|
| Ventilation for hold spaces--TB/ALL.
|
|
|
|
| Venting of cargo tanks of tankships constructed on or after July 1, 1951--T/ALL.
|
|
|
|
| Venting of cargo tanks of tank barges constructed on or after July 1, 1951--B/ALL.
|
|
|
|
| Venting of cargo tanks of tank vessels constructed between November 10, 1936, and July 1, 1951--TB/ALL.
|
|
|
|
| Venting of cargo tanks on tank vessels constructed prior to November 10, 1936--TB/ALL.
|
|
|
|
| Venting of cofferdams and void spaces of tank vessels constructed on or after November 10, 1936--TB/ALL.
|
|
|
|
| Ventilation of tankships that have a keel laying date on or after January 1, 1975--T/ALL.
|
|
Subpart 32.56--STRUCTURAL FIRE PROTECTION FOR TANK SHIPS WITH A KEEL LAYING DATE ON OR AFTER JANUARY 1, 1975
|
|
| Navigation positions--T/ALL.
|
|
|
|
| Insulation of exterior boundaries: Superstructures and deckhouses--T/ALL.
|
|
|
|
| Openings in exterior boundaries: Accommodation, service, and control spaces--T/ALL.
|
|
|
|
| Openings in and insulation of boundaries: Other spaces--T/ALL.
|
|
|
|
| Category A machinery spaces: Windows and port lights--T/ALL.
|
|
|
|
| Category A machinery spaces: Bulkheads and decks--T/ALL.
|
|
|
|
| Category A machinery spaces: Insulation--T/ALL.
|
|
|
|
| Combustible veneers--T/ALL.
|
|
|
|
| Ventilation ducts--T/ALL.
|
|
Subpart 32.57--STRUCTURAL FIRE PROTECTION FOR TANK VESSELS CONTRACTED FOR ON OR AFTER JANUARY 1, 1963
Subpart 32.59--MINIMUM LONGITUDINAL STRENGTH AND PLATING THICKNESS REQUIREMENTS FOR UNCLASSED TANK VESSELS THAT CARRY CERTAIN OIL CARGOES--TB/ALL
|
|
| Minimum section modulus and plating thickness requirements--TB/ALL.
|
|
Subpart 32.60--HULL REQUIREMENTS FOR TANK VESSELS CONSTRUCTED ON OR AFTER JULY 1, 1951
|
|
| Scantlings, material, and workmanship--TB/ALL.
|
|
|
|
| Subdivision of cargo space--TB/ALL.
|
|
|
|
| Segregation of cargo; Grade A, B, C, or D--TB/ALL.
|
|
|
|
| Segregation of cargo; Grade E--TB/ALL.
|
|
|
|
| Pumprooms on tank vessels carrying Grade A, B, C, D and/or E liquid cargo--TB/ALL.
|
|
|
|
| Tank vessels with independent tanks--TB/ALL.
|
|
|
|
| Tank vessels carrying Grade A liquid cargo--TB/ALL.
|
|
|
|
| Construction and testing of cargo tanks and bulkheads--TB/ALL.
|
|
|
|
| Segregation of spaces containing the emergency source of electric power--TB/ALL.
|
|
Subpart 32.63--HULL AND CARGO TANK REQUIREMENTS FOR TANK BARGES CONSTRUCTED OR CONVERTED ON OR AFTER JULY 1, 1964, AND CARRYING CERTAIN DANGEROUS BULK CARGOES
|
|
| Barge hull classifications--B/ALL.
|
|
|
|
| Alternative arrangements--B/ALL.
|
|
|
|
| Rakes and coamings--B/ALL.
|
|
|
|
| Cargo tanks and supports--B/ALL.
|
|
Subpart 32.65--HULL REQUIREMENTS FOR TANK VESSELS CONSTRUCTED ON OR AFTER NOVEMBER 10, 1936, AND PRIOR TO JULY 1, 1951
|
|
| Scantlings, material, and workmanship--TB/ALL.
|
|
|
|
| Subdivision of cargo space--TB/ALL.
|
|
|
|
| Tank vessels with independent tanks--TB/ALL.
|
|
|
|
| Tank vessels carrying Grade A liquids--TB/ALL.
|
|
|
|
| Construction and testing of cargo tanks and bulkheads--TB/ALL.
|
|
Subpart 32.70--HULL REQUIREMENTS FOR STEEL HULL TANK VESSELS CONSTRUCTED PRIOR TO NOVEMBER 10, 1936
|
|
| Hull requirements; general--TB/ALL.
|
|
|
|
| Pump-engine compartment--TB/ALL.
|
|
Subpart 32.75--HULL REQUIREMENTS FOR WOOD HULL TANK VESSELS CONSTRUCTED PRIOR TO NOVEMBER 10, 1936
|
|
| Hull requirements; general--TB/ALL.
|
|
|
|
| Electric bonding and grounding for tanks--TB/ALL.
|
|
|
|
| Hold spaces and bulkheads--TB/ALL.
|
|
Subpart 32.80--TANK BARGES CONSTRUCTED OF MATERIALS OTHER THAN STEEL OR IRON
|
|
| General requirements--B/ALL.
|
|
Subpart 32.85--LAMP AND PAINT ROOMS AND SIMILAR COMPARTMENTS ON TANKSHIPS
|
|
| Fireproofing of lamp, oil and paint rooms--T/ALL.
|
|
Subpart 32.90--PILOT BOARDING EQUIPMENT
|
|
| Pilot boarding equipment.
|
|