46 C.F.R. PART 32--SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS
TITLE 46--Shipping
CHAPTER I--COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
SUBCHAPTER D--TANK VESSELS
PART 32--SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS
Subpart 32.01--GENERAL
|
Incorporation by reference.
|
|
Subpart 32.02--SAFETY REQUIREMENTS
|
Communication between deckhouses--TB/OCLB.
|
|
|
Guards at dangerous places--TB/ALL.
|
|
Subpart 32.05--MARKINGS
|
Draft marks and draft indicating systems--TB/ALL.
|
|
|
Vessel's name on equipment--TB/ALL.
|
|
|
Name of tank barge--B/ALL.
|
|
Subpart 32.15--NAVIGATION EQUIPMENT
|
Sounding machines--T/OCL.
|
|
|
Anchors, Chains, and Hawsers--TB/ALL
|
|
|
Magnetic Compass and Gyrocompass--T/OC.
|
|
Subpart 32.16--NAVIGATION BRIDGE VISIBILITY
|
Navigation bridge visibility-T/ALL.
|
|
Subpart 32.20--EQUIPMENT INSTALLATIONS
|
Equipment installations on vessels during World War II--TB/ALL.
|
|
|
Pressure vacuum relief valves--TB/ALL.
|
|
|
Liquid level gaging--T/ALL.
|
|
Subpart 32.25--GENERAL ALARM SYSTEMS
|
General alarm systems for tankships and manned tank barges.
|
|
Subpart 32.30--SOUND POWERED TELEPHONE, VOICE TUBE, AND ENGINE ORDER TELEGRAPH SYSTEMS
|
Voice tubes or telephone equipment--T/ALL.
|
|
|
Engine order telegraph equipment--T/ALL.
|
|
Subpart 32.35--MAIN AND AUXILIARY MACHINERY
|
Boilers and machinery--TB/ALL.
|
|
|
Installation of internal combustion engines--TB/ALL.
|
|
|
Steering apparatus on tank vessels--TB/ALL.
|
|
|
Installation of air compressors on tank vessels contracted for on or after June 15, 1977--TB/ALL.
|
|
Subpart 32.40--ACCOMMODATIONS FOR OFFICERS AND CREW
|
Location of crew spaces--T/ALL.
|
|
|
Sleeping accommodations--T/ALL.
|
|
|
Washrooms and toilet rooms--T/ALL.
|
|
|
Heating and cooling--T/ALL.
|
|
|
Crew accommodations on tankships of less than 100 gross tons and manned tank barges--TB/ALL.
|
|
|
Crew accommodations on tankships constructed before June 15, 1987--T/ALL.
|
|
Subpart 32.45--ELECTRICAL INSTALLATIONS
|
Installation and details.
|
|
Subpart 32.50--PUMPS, PIPING, AND HOSE FOR CARGO HANDLING
|
Cargo pumps for tank vessels constructed on or after November 10, 1936--TB/ALL.
|
|
|
Cargo pump gauges on tank vessels constructed on or after November 10, 1936--TB/ALL.
|
|
|
Cargo pumps on tank vessels with independent cargo tanks which were constructed prior to November 10, 1936--TB/ALL.
|
|
|
Cargo piping on tank vessels constructed on or after July 1, 1951--TB/ALL.
|
|
|
Cargo piping for tank vessels constructed between November 10, 1936, and July 1, 1951--TB/ALL.
|
|
|
Cargo pumps and piping on tank vessels constructed prior to November 10, 1936--TB/ALL.
|
|
|
Remote manual shutdown for internal combustion engine driven cargo pump on tank vessels--TB/ALL.
|
|
Subpart 32.52--BILGE SYSTEMS
|
Bilge pumps on tank vessels constructed or converted on or after November 19, 1952--TB/ALL.
|
|
|
Bilge piping for pump rooms and adjacent cofferdams on tank vessels constructed or converted on or after November 19, 1952--TB/ALL.
|
|
|
Bilge pumps and piping on tank vessels constructed or converted prior to November 19, 1952--TB/ALL.
|
|
Subpart 32.53--INERT GAS SYSTEM
Subpart 32.55--VENTILATION AND VENTING
|
Ventilation of tank vessels constructed on or after July 1, 1951--TB/ALL.
|
|
|
Ventilation of tank vessels constructed between November 10, 1936, and July 1, 1951--TB/ALL.
|
|
|
Ventilation of tank vessels contracted prior to November 10, 1936--TB/ALL.
|
|
|
Ventilation for hold spaces--TB/ALL.
|
|
|
Venting of cargo tanks of tankships constructed on or after July 1, 1951--T/ALL.
|
|
|
Venting of cargo tanks of tank barges constructed on or after July 1, 1951--B/ALL.
|
|
|
Venting of cargo tanks of tank vessels constructed between November 10, 1936, and July 1, 1951--TB/ALL.
|
|
|
Venting of cargo tanks on tank vessels constructed prior to November 10, 1936--TB/ALL.
|
|
|
Venting of cofferdams and void spaces of tank vessels constructed on or after November 10, 1936--TB/ALL.
|
|
|
Ventilation of tankships that have a keel laying date on or after January 1, 1975--T/ALL.
|
|
Subpart 32.56--STRUCTURAL FIRE PROTECTION FOR TANK SHIPS WITH A KEEL LAYING DATE ON OR AFTER JANUARY 1, 1975
|
Navigation positions--T/ALL.
|
|
|
Insulation of exterior boundaries: Superstructures and deckhouses--T/ALL.
|
|
|
Openings in exterior boundaries: Accommodation, service, and control spaces--T/ALL.
|
|
|
Openings in and insulation of boundaries: Other spaces--T/ALL.
|
|
|
Category A machinery spaces: Windows and port lights--T/ALL.
|
|
|
Category A machinery spaces: Bulkheads and decks--T/ALL.
|
|
|
Category A machinery spaces: Insulation--T/ALL.
|
|
|
Combustible veneers--T/ALL.
|
|
|
Ventilation ducts--T/ALL.
|
|
Subpart 32.57--STRUCTURAL FIRE PROTECTION FOR TANK VESSELS CONTRACTED FOR ON OR AFTER JANUARY 1, 1963
Subpart 32.59--MINIMUM LONGITUDINAL STRENGTH AND PLATING THICKNESS REQUIREMENTS FOR UNCLASSED TANK VESSELS THAT CARRY CERTAIN OIL CARGOES--TB/ALL
|
Minimum section modulus and plating thickness requirements--TB/ALL.
|
|
Subpart 32.60--HULL REQUIREMENTS FOR TANK VESSELS CONSTRUCTED ON OR AFTER JULY 1, 1951
|
Scantlings, material, and workmanship--TB/ALL.
|
|
|
Subdivision of cargo space--TB/ALL.
|
|
|
Segregation of cargo; Grade A, B, C, or D--TB/ALL.
|
|
|
Segregation of cargo; Grade E--TB/ALL.
|
|
|
Pumprooms on tank vessels carrying Grade A, B, C, D and/or E liquid cargo--TB/ALL.
|
|
|
Tank vessels with independent tanks--TB/ALL.
|
|
|
Tank vessels carrying Grade A liquid cargo--TB/ALL.
|
|
|
Construction and testing of cargo tanks and bulkheads--TB/ALL.
|
|
|
Segregation of spaces containing the emergency source of electric power--TB/ALL.
|
|
Subpart 32.63--HULL AND CARGO TANK REQUIREMENTS FOR TANK BARGES CONSTRUCTED OR CONVERTED ON OR AFTER JULY 1, 1964, AND CARRYING CERTAIN DANGEROUS BULK CARGOES
|
Barge hull classifications--B/ALL.
|
|
|
Alternative arrangements--B/ALL.
|
|
|
Rakes and coamings--B/ALL.
|
|
|
Cargo tanks and supports--B/ALL.
|
|
Subpart 32.65--HULL REQUIREMENTS FOR TANK VESSELS CONSTRUCTED ON OR AFTER NOVEMBER 10, 1936, AND PRIOR TO JULY 1, 1951
|
Scantlings, material, and workmanship--TB/ALL.
|
|
|
Subdivision of cargo space--TB/ALL.
|
|
|
Tank vessels with independent tanks--TB/ALL.
|
|
|
Tank vessels carrying Grade A liquids--TB/ALL.
|
|
|
Construction and testing of cargo tanks and bulkheads--TB/ALL.
|
|
Subpart 32.70--HULL REQUIREMENTS FOR STEEL HULL TANK VESSELS CONSTRUCTED PRIOR TO NOVEMBER 10, 1936
|
Hull requirements; general--TB/ALL.
|
|
|
Pump-engine compartment--TB/ALL.
|
|
Subpart 32.75--HULL REQUIREMENTS FOR WOOD HULL TANK VESSELS CONSTRUCTED PRIOR TO NOVEMBER 10, 1936
|
Hull requirements; general--TB/ALL.
|
|
|
Electric bonding and grounding for tanks--TB/ALL.
|
|
|
Hold spaces and bulkheads--TB/ALL.
|
|
Subpart 32.80--TANK BARGES CONSTRUCTED OF MATERIALS OTHER THAN STEEL OR IRON
|
General requirements--B/ALL.
|
|
Subpart 32.85--LAMP AND PAINT ROOMS AND SIMILAR COMPARTMENTS ON TANKSHIPS
|
Fireproofing of lamp, oil and paint rooms--T/ALL.
|
|
Subpart 32.90--PILOT BOARDING EQUIPMENT
|
Pilot boarding equipment.
|
|