46 C.F.R. § 58.30-50 Requirements for miscellaneous fluid power and control systems.
Title 46 - Shipping
(a) All fluid power and control systems installed on a vessel, except those listed in §58.30–1(a), must meet the following requirements: (1) Diagrams of the system providing the information required by §58.30–40(a)(1) through (4) must be submitted. These are not approved but are needed for records and for evaluation of the system in accordance with §58.30–1(a)(14). (2) The hydraulic fluid used in the system must comply with §58.30–10. (3) The installed system must be tested in accordance with §58.30–35(c)(2). (4) All pneumatic cylinders must comply with §58.30–30. (5) Additional plans may be required for “fail-safe” equipment and for cargo hatch systems with alternate means of operation. [CGD 73–254, 40 FR 40168, Sept. 2, 1975]
Title 46: Shipping
PART 58—MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS
Subpart 58.30—Fluid Power and Control Systems
§ 58.30-50 Requirements for miscellaneous fluid power and control systems.