46 C.F.R. § 58.30-40   Plans.


Title 46 - Shipping


Title 46: Shipping
PART 58—MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS
Subpart 58.30—Fluid Power and Control Systems

Browse Previous |  Browse Next

§ 58.30-40   Plans.

(a) Diagrammatic plans and lists of materials must be submitted for each of the fluid power and control systems listed in §58.30–1(a) that is installed on the vessel. Plan submission must be in accordance with subpart 50.20 of this subchapter and must include the following:

(1) The purpose of the system.

(2) Its location on the vessel.

(3) The maximum allowable working pressure.

(4) The fluid used in the system.

(5) The velocity of the fluid flow in the system.

(6) Details of the system components in accordance with §56.01–10(d) of this subchapter.

[CGD 73–254, 40 FR 40168, Sept. 2, 1975]

Browse Previous |  Browse Next

chanrobles.com


ChanRobles Legal Resources:

ChanRobles On-Line Bar Review

ChanRobles Internet Bar Review : www.chanroblesbar.com

ChanRobles MCLE On-line

ChanRobles Lawnet Inc. - ChanRobles MCLE On-line : www.chanroblesmcleonline.com