46 C.F.R. § 64.79   Inspection of pressure and vacuum relief device.


Title 46 - Shipping


Title 46: Shipping
PART 64—MARINE PORTABLE TANKS AND CARGO HANDLING SYSTEMS
Subpart E—Periodic Inspections and Tests of MPTs

Browse Previous |  Browse Next

§ 64.79   Inspection of pressure and vacuum relief device.

(a) The inspection of the pressure and vacuum relief device required in §64.77(a) must include—

(1) Disassembling;

(2) A visual inspection for defective parts; and

(3) A test of the accuracy of the pressure setting.

(b) If the pressure and vacuum relief valve passes the inspection required in paragraph (a) of this section, the owner or his representative may attach to the device a metal tag containing the date of the inspection.

Browse Previous |  Browse Next

chanrobles.com


ChanRobles Legal Resources:

ChanRobles On-Line Bar Review

ChanRobles Internet Bar Review : www.chanroblesbar.com

ChanRobles MCLE On-line

ChanRobles Lawnet Inc. - ChanRobles MCLE On-line : www.chanroblesmcleonline.com