46 C.F.R. PART 64--MARINE PORTABLE TANKS AND CARGO HANDLING SYSTEMS
TITLE 46--Shipping
CHAPTER I--COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
SUBCHAPTER F--MARINE ENGINEERING
PART 64--MARINE PORTABLE TANKS AND CARGO HANDLING SYSTEMS
Subpart A--GENERAL
|
Incorporation by reference.
|
|
|
Maintenance, repair, and alteration of MPTs.
|
|
Subpart B--STANDARDS FOR AN MPT
|
Allowable stress; framework.
|
|
|
Bottom filling or discharge connection.
|
|
|
Information plate for MPTs.
|
|
Subpart C--PRESSURE RELIEF DEVICES AND VACUUM RELIEF DEVICES FOR MPTS
|
Acceptance of pressure relief devices.
|
|
|
Spring loaded pressure relief valve.
|
|
|
Minimum emergency venting capacity.
|
|
|
Location of the pressure relief device.
|
|
|
Marking of pressure relief devices.
|
|
Subpart D--[RESERVED]
Subpart E--PERIODIC INSPECTIONS AND TESTS OF MPTS
|
Inspection of pressure and vacuum relief device.
|
|
|
30-month inspection of an MPT.
|
|
Subpart F--CARGO HANDLING SYSTEM
|
Plan approval, construction, and inspection of cargo-handling systems.
|
|
|
Relief valve for the cargo pump discharge.
|
|