46 C.F.R. § 162.050-1 Scope.
Title 46 - Shipping
(a) This subpart contains— (1) Procedures for approval of 100 p.p.m. separators, 15 p.p.m. separators, cargo monitors, bilge monitors, and bilge alarms; (2) Design specifications for this equipment; (3) Tests required for approval; (4) Procedures for obtaining designation as a facility authorized to conduct approval tests; (5) Marking requirements; and (6) Factory inspection procedures. (b) [Reserved]
Title 46: Shipping
PART 162—ENGINEERING EQUIPMENT
Subpart 162.050—Pollution Prevention Equipment
§ 162.050-1 Scope.

