46 C.F.R. PART 162--ENGINEERING EQUIPMENT
TITLE 46--Shipping
Chapter I--Coast Guard, Department of Homeland Security
SUBCHAPTER Q--EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL
PART 162--ENGINEERING EQUIPMENT
Subpart 162.017--VALVES, PRESSURE-VACUUM RELIEF, FOR TANK VESSELS
|
|
| Applicable specifications.
|
|
|
|
| Materials, construction, and workmanship.
|
|
Subpart 162.018--SAFETY RELIEF VALVES, LIQUEFIED COMPRESSED GAS
|
|
| Applicable specifications, and referenced material.
|
|
|
|
| Construction and workmanship.
|
|
|
|
| Blow-down adjustment and popping tolerance.
|
|
Subpart 162.027--COMBINATION SOLID STREAM AND WATER SPRAY FIREHOSE NOZZLES
|
|
| Incorporation by reference.
|
|
|
|
| Design, construction, testing and marking requirements.
|
|
Subpart 162.028--EXTINGUISHERS, FIRE, PORTABLE, MARINE TYPE
|
|
| Applicable specifications.
|
|
|
|
| Independent laboratories: Listing.
|
|
|
|
| Examinations, tests, and inspections.
|
|
|
|
| Procedure for listing and labeling.
|
|
|
|
| Termination of listing or labeling.
|
|
Subpart 162.039--EXTINGUISHERS, FIRE, SEMIPORTABLE, MARINE TYPE
|
|
| Applicable specifications.
|
|
|
|
| Examinations, tests, and inspections.
|
|
|
|
| Procedure for listing and labeling.
|
|
|
|
| Termination of listing or labeling.
|
|
Subpart 162.050--POLLUTION PREVENTION EQUIPMENT
|
|
| Documents incorporated by reference.
|
|
|
|
| Factory production and inspection.
|
|
|
|
| Sample collection and preservation.
|
|
|
|
| Designation of facilities.
|
|
|
|
| Monitor and bilge alarm test rig.
|
|
|
|
| Separator: Design specification.
|
|
|
|
| Separator: Approval tests.
|
|
|
|
| Cargo monitor: Design specification.
|
|
|
|
| Cargo monitor: Approval tests.
|
|
|
|
| Bilge monitor: Design specification.
|
|
|
|
| Bilge monitor: Approval tests.
|
|
|
|
| Bilge alarm: Design specification.
|
|
|
|
| Bilge alarm: Approval tests.
|
|
|
|
| Measurement of oil content.
|
|