47 C.F.R. § 22.946   Service commencement and construction systems.


Title 47 - Telecommunication


Title 47: Telecommunication
PART 22—PUBLIC MOBILE SERVICES
Subpart H—Cellular Radiotelephone Service

Browse Previous |  Browse Next

§ 22.946   Service commencement and construction systems.

(a) Commencement of service. New cellular systems must be at least partially constructed and begin providing cellular service to subscribers within the service commencement periods specified in Table H–1 of this section. Service commencement periods begin on the date of grant of the initial authorization, and are not extended by the grant of subsequent authorizations for the cellular system (such as for major modifications). The licensee must notify the FCC (FCC Form 601) after the requirements of this section are met (see §1.946 of this chapter).

                    Table H-1_Commencement of Service------------------------------------------------------------------------        Type of cellular system          Required to commence service in------------------------------------------------------------------------The first system authorized on each      36 months. channel block in markets 1-90.The first system authorized on each      18 months. channel block in all other markets and any subsequent systems authorized pursuant to contracts in partitioned markets.The first system authorized on each      No requirement. channel block in the Gulf of Mexico Exclusive Zone.All other systems......................  12 months.------------------------------------------------------------------------

(b) To satisfy this requirement, a cellular system must be interconnected with the public switched telephone network (PSTN) and must be providing service to mobile stations operated by its subscribers and roamers. A cellular system is considered to be providing service only if mobile stations can originate telephone calls to and receive telephone calls from wireline telephones through the PSTN.

(c) Construction period for specific facilities. The construction period applicable to specific new or modified cellular facilities for which a separate authorization is granted is one year, beginning on the date the authorization is granted.

[67 FR 9609, Mar. 4, 2002, as amended at 67 FR 77192, Dec. 17, 2002]

Browse Previous |  Browse Next

chanrobles.com