47 C.F.R. PART 22--PUBLIC MOBILE SERVICES
TITLE 47--Telecommunication
CHAPTER I--FEDERAL COMMUNICATIONS COMMISSION
SUBCHAPTER B--COMMON CARRIER SERVICES
PART 22--PUBLIC MOBILE SERVICES
Subpart A--SCOPE AND AUTHORITY
Subpart B--LICENSING REQUIREMENTS AND PROCEDURES
|
General application requirements.
|
|
|
Procedures for mutually exclusive applications.
|
|
|
Construction prior to grant of application.
|
|
|
Standard pre-filing technical coordination procedure.
|
|
|
Additional transmitters for existing systems.
|
|
|
International coordination of channel assignments.
|
|
|
Paging geographic area authorizations are subject to competitive bidding.
|
|
|
Filing of long-form applications.
|
|
|
Bidding credit for small businesses.
|
|
|
Eligibility for partitioned licenses.
|
|
|
Certifications, disclosures, records maintenance, and definitions.
|
|
|
Petitions to deny and limitations on settlements.
|
|
|
Cellular rural service area licenses subject to competitive bidding.
|
|
Subpart C--OPERATIONAL AND TECHNICAL REQUIREMENTS
|
Retention of station authorizations; identifying transmitters.
|
|
|
Operator and maintenance requirements.
|
|
|
Operation during emergency.
|
|
|
Discontinuance of station operation.
|
|
|
Equal employment opportunities.
|
|
|
Channel assignment policy.
|
|
|
Protection from interference.
|
|
|
Antenna structures; air navigation safety.
|
|
|
Disturbance of AM broadcast station antenna patterns.
|
|
|
Certification of transmitters.
|
|
|
In-building radiation systems.
|
|
Subpart D--DEVELOPMENTAL AUTHORIZATIONS
|
Description and purposes of developmental authorizations.
|
|
|
Developmental authorization for a new Public Mobile Service or technology.
|
|
|
Developmental authorization of 72-76 MHz fixed transmitters.
|
|
Subpart E--PAGING AND RADIOTELEPHONE SERVICE
|
Paging geographic area authorizations.
|
|
|
Number of transmitters per station.
|
|
|
Procedures for mutually exclusive applications in the Paging and Radiotelephone Service.
|
|
|
Construction period for the Paging and Radiotelephone Service.
|
|
|
Partitioning and disaggregation.
|
|
|
Permissible communications paths.
|
|
|
Application requirements for the Paging and Radiotelephone Service.
|
|
|
Channels for paging operation.
|
|
|
Effective radiated power limits.
|
|
|
Technical channel assignment criteria.
|
|
|
Paging application requirements.
|
|
|
Channels for one-way or two-way mobile operation.
|
|
|
Transmitting power limits.
|
|
|
Technical channel assignment criteria.
|
|
|
Responsibility for mobile stations.
|
|
|
Use of base transmitters as repeaters.
|
|
|
Use of mobile channel for remote control of station functions.
|
|
|
Operation of mobile transmitters across U.S.-Canada border.
|
|
|
One-way or two-way application requirements.
|
|
|
Channels for point-to-point operation.
|
|
|
Effective radiated power limits.
|
|
|
Assignment of 72-76 MHz channels.
|
|
|
Existing microwave stations licensed under this part.
|
|
|
Transition of the 2110-2130 and 2160-2180 MHz channels to emerging technologies.
|
|
|
488-494 MHz fixed service in Hawaii.
|
|
|
Channels for point-to-multipoint operation.
|
|
|
Effective radiated power limits.
|
|
|
470-512 MHz channels for trunked mobile operation.
|
|
|
Effective radiated power limits.
|
|
Subpart F--RURAL RADIOTELEPHONE SERVICE
|
Separate rural subscriber station authorization not required.
|
|
|
Rural radiotelephone system configuration.
|
|
|
Rural radiotelephone service application requirements.
|
|
|
Provision of information to applicants.
|
|
|
Construction period for rural radiotelephone stations.
|
|
|
Technical channel assignment criteria for rural radiotelephone stations.
|
|
|
Procedure for mutually exclusive applications in the Rural Radiotelephone Service.
|
|
|
Additional channel policy for rural radiotelephone stations.
|
|
|
Geographic area authorizations.
|
|
|
Secondary site-by-site authorizations.
|
|
|
Channels for conventional rural radiotelephone stations and basic exchange telephone radio systems.
|
|
|
Power limits for conventional rural radiotelephone transmitters.
|
|
|
Temporary fixed stations.
|
|
|
Channels for basic exchange telephone radio systems.
|
|
Subpart G--AIR-GROUND RADIOTELEPHONE SERVICE
|
Channels for general aviation air-ground service.
|
|
|
General aviation air-ground application requirements.
|
|
|
Transmitting power limits.
|
|
|
Technical channel pair assignment criteria.
|
|
|
Construction period for general aviation ground stations.
|
|
|
Additional channel policies.
|
|
|
Eligibility to hold interest in licenses limited to 3 MHz of spectrum.
|
|
|
Channel plan for commercial aviation air-ground systems.
|
|
|
Incumbent commercial aviation air-ground systems.
|
|
|
Effective radiated power limits.
|
|
|
Construction requirements for commercial aviation air-ground systems.
|
|
|
Unacceptable interference to Part 90 non-cellular 800 MHz licensees from commercial aviation air-ground systems.
|
|
|
Obligation to abate unacceptable interference.
|
|
|
Interference resolution procedures.
|
|
|
Air-Ground Radiotelephone Service subject to competitive bidding.
|
|
Subpart H--CELLULAR RADIOTELEPHONE SERVICE
|
Cellular service requirements and limitations.
|
|
|
Channels for cellular service.
|
|
|
Coordination of channel usage.
|
|
|
Cellular geographic service area.
|
|
|
Service area boundary extensions.
|
|
|
Effective radiated power limits.
|
|
|
Emission limitations for cellular equipment.
|
|
|
911 call processing procedures; 911-only calling mode.
|
|
|
Cellular system configuration.
|
|
|
Prohibition on airborne operation of cellular telephones.
|
|
|
Responsibility for mobile stations.
|
|
|
Application requirements for the Cellular Radiotelephone Service.
|
|
|
Procedures for comparative renewal proceedings.
|
|
|
Dismissal of applications in cellular renewal proceedings.
|
|
|
Site availability requirements for applications competing with cellular renewal applications.
|
|
|
Criteria for comparative cellular renewal proceedings.
|
|
|
Limitations on transfer of control and assignment for authorizations issued as a result of a comparative renewal proceeding.
|
|
|
Service commencement and construction systems.
|
|
|
Five year build-out period.
|
|
|
Partitioning and Disaggregation.
|
|
|
Unserved area licensing process.
|
|
|
Provision of service in the Gulf of Mexico Service Area (GMSA)
|
|
|
Minimum coverage requirement.
|
|
|
Content and form of applications.
|
|
|
Rules governing processing of applications for initial systems.
|
|
|
Cellular unserved area radiotelephone licenses subject to competitive bidding.
|
|
|
Cellular RSA licenses subject to competitive bidding.
|
|
|
Unacceptable interference to part 90 non-cellular 800 MHz licensees from cellular radiotelephone or part 90-800 MHz cellular systems.
|
|
|
Obligation to abate unacceptable interference.
|
|
|
Interference resolution procedures.
|
|
Subpart I--OFFSHORE RADIOTELEPHONE SERVICE
|
Channels for offshore radiotelephone systems.
|
|
|
Antenna height limitations.
|
|
|
Effective radiated power limitations.
|
|
|
Permissible communications.
|
|
|
Temporary fixed stations.
|
|
|
Application requirements for offshore stations.
|
|