10 C.F.R. PART 434--ENERGY CODE FOR NEW FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH RISE RESIDENTIAL BUILDINGS
TITLE 10--Energy
CHAPTER II--DEPARTMENT OF ENERGY
SUBCHAPTER D--ENERGY CONSERVATION
PART 434--ENERGY CODE FOR NEW FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH RISE RESIDENTIAL BUILDINGS
|
|
| Explanation of numbering system for codes.
|
|
Subpart A--ADMINISTRATION AND ENFORCEMENT--GENERAL
|
|
| Referenced standards (RS).
|
|
Subpart B--DEFINITIONS
Subpart C--DESIGN CONDITIONS
Subpart D--BUILDING DESIGN REQUIREMENTS--ELECTRIC SYSTEMS AND EQUIPMENT
|
|
| Electrical power and lighting systems.
|
|
|
|
| Building envelope assemblies and materials.
|
|
|
|
| Building mechanical systems and equipment.
|
|
|
|
| Building service systems and equipment.
|
|
Subpart E--BUILDING ENERGY COST COMPLIANCE ALTERNATIVE
|
|
| Determination of the annual energy cost budget.
|
|
|
|
| Prototype building procedure.
|
|
|
|
| Use of the prototype building to determine the energy cost budget.
|
|
|
|
| Reference building method.
|
|
|
|
| Use of the reference building to determine the energy cost budget.
|
|
|
|
| Calculation procedure and simulation tool.
|
|
|
|
| Determination of the design energy consumption and design energy cost.
|
|
|
|
| Standard calculation procedure.
|
|
|
|
| Building exterior envelope.
|
|
|
|
| HVAC systems and equipment.
|
|
Subpart F--BUILDING ENERGY COMPLIANCE ALTERNATIVE
|
|
| Determination of the annual energy budget.
|
|
|
|
| Determination of the design energy use.
|
|
|
|
| Standard Calculation Procedure.
|
|
|
|
| Life cycle cost analysis criteria.
|
|
Subpart G--REFERENCE STANDARDS