30 C.F.R. PART 18--ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES
TITLE 30--Mineral Resources
CHAPTER I--MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR
SUBCHAPTER B--TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS
PART 18--ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES
Subpart A--GENERAL PROVISIONS
|
|
| Electrical equipment for which approval is issued.
|
|
|
|
| Equipment for which certification will be issued.
|
|
|
|
| Date for conducting investigation and tests.
|
|
|
|
| Conduct of investigations and tests.
|
|
|
|
| Notice of approval or disapproval.
|
|
|
|
| Identification of tested noncertified explosion-proof enclosures.
|
|
|
|
| Changes after approval or certification.
|
|
|
|
| Withdrawal of approval, certification, or acceptance.
|
|
Subpart B--CONSTRUCTION AND DESIGN REQUIREMENTS
|
|
| Quality of material, workmanship, and design.
|
|
|
|
| Machines equipped with powered dust collectors.
|
|
|
|
| Boring-type machines equipped for auxiliary face ventilation.
|
|
|
|
| Limitation of external surface temperatures.
|
|
|
|
| Combustible gases from insulating material.
|
|
|
|
| Devices for pressure relief, ventilation, or drainage.
|
|
|
|
| Access openings and covers, including unused lead-entrance holes.
|
|
|
|
| Enclosures--joints and fastenings.
|
|
|
|
| Fastenings--additional requirements.
|
|
|
|
| Finish of surface joints.
|
|
|
|
| Portable (trailing) cables and cords.
|
|
|
|
| Cables between machine components.
|
|
|
|
| Leads through common walls.
|
|
|
|
| Plug and receptacle-type connectors.
|
|
|
|
| Explosion-proof distribution boxes.
|
|
|
|
| Explosion-proof splice boxes.
|
|
|
|
| Non-intrinsically safe battery-powered equipment.
|
|
|
|
| Circuit-interrupting devices.
|
|
|
|
| Connection boxes on machines.
|
|
|
|
| Protection against external arcs and sparks.
|
|
|
|
| Electrical protection of circuits and equipment.
|
|
|
|
| High-voltage longwall mining systems.
|
|
Subpart C--INSPECTIONS AND TESTS
|
|
| Detailed inspection of components.
|
|
|
|
| Final inspection of complete machine.
|
|
|
|
| Tests to determine explosion-proof characteristics.
|
|
|
|
| Flame test of conveyor belting and hose.
|
|
|
|
| Tests of windows and lenses.
|
|
|
|
| Tests for intrinsic safety.
|
|
Subpart D--MACHINES ASSEMBLED WITH CERTIFIED OR EXPLOSION-PROOF COMPONENTS, FIELD MODIFICATIONS OF APPROVED MACHINES, AND PERMITS TO USE EXPERIMENTAL EQUIPMENT
|
|
| Approval of machines assembled with certified or explosion-proof components.
|
|
|
|
| Field modification of approved (permissible) equipment; application for approval of modification; approval of plans for modification before modification.
|
|
|
|
| Permit to use experimental electric face equipment in a gassy mine or tunnel.
|
|
Subpart E--FIELD APPROVAL OF ELECTRICALLY OPERATED MINING EQUIPMENT
|
|
| Electric equipment for which field approvals will be issued.
|
|
|
|
| Quality of material and design.
|
|
|
|
| Application for field approval; filing procedures.
|
|
|
|
| Application for field approval; contents of application.
|
|
|
|
| Approval of machines constructed of components approved, accepted or certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G.
|
|
|
|
| Preparation of machines for inspection; requirements.
|
|
|
|
| Inspection of machines; minimum requirements.
|
|
|
|
| Enclosures, joints, and fastenings; pressure testing.
|
|
|
|
| Notice of approval or disapproval; letters of approval and approval plates.
|
|