46 C.F.R. PART 154--SAFETY STANDARDS FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES
TITLE 46--Shipping
CHAPTER I--COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
SUBCHAPTER O--CERTAIN BULK DANGEROUS CARGOES
PART 154--SAFETY STANDARDS FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES
Subpart A--GENERAL
|
Incorporation by reference.
|
|
|
Definitions, acronyms, and terms.
|
|
|
Existing gas vessel: Endorsements and requirements.
|
|
|
U.S. flag vessel: Endorsement application.
|
|
|
U.S. flag vessel: Certificate of Inspection endorsement.
|
|
|
U.S. flag vessel: IMO certificate issuance.
|
|
|
Foreign flag vessel: Certificate of Compliance endorsement application.
|
|
|
Foreign flag vessel: IMO Certificate.
|
|
|
Liquefied gases not included in table 4.
|
|
|
Special approval: Requests.
|
|
|
Correspondence and vessel information: Submission.
|
|
Subpart B--INSPECTIONS AND TESTS
|
Examination required for a Certificate of Compliance.
|
|
|
Procedures for having the Coast Guard examine a vessel for a Certificate of Compliance.
|
|
Subpart C--DESIGN, CONSTRUCTION AND EQUIPMENT
|
Outer hull steel plating.
|
|
|
Contiguous steel hull structure.
|
|
|
Transverse contiguous hull structure.
|
|
|
Longitudinal contiguous hull structure.
|
|
|
Contiguous hull structure: Heating system.
|
|
|
Contiguous hull structure: Welding procedure.
|
|
|
Contiguous hull structure: Production weld test.
|
|
|
Membrane tank: Inner hull steel.
|
|
|
Aluminum cargo tank: Steel enclosure.
|
|
|
Stability requirements: General.
|
|
|
Segregation of hold spaces from other spaces.
|
|
|
Segregation of hold spaces from the sea.
|
|
|
Cargo pump and cargo compressor rooms.
|
|
|
Accommodation, service, and control spaces.
|
|
|
Openings to accommodation, service, or control spaces.
|
|
|
Access to tanks and spaces in the cargo area.
|
|
|
Bilge and ballast systems in the cargo area.
|
|
|
Bow and stern loading piping.
|
|
|
Cargo emergency jettisoning piping.
|
|
|
Design vapor pressure (P) of a cargo tank.
|
|
|
Design loads for cargo tanks and fixtures: General.
|
|
|
Cargo tank internal pressure head.
|
|
|
Cargo tank external pressure load.
|
|
|
Dynamic loads from vessel motion.
|
|
|
Cargo tank sloshing loads.
|
|
|
Cargo tank thermal loads.
|
|
|
Cargo tank corrosion allowance.
|
|
|
Membrane tank system design.
|
|
|
Expansion and contraction.
|
|
|
Failure to meet independent tank type C standards.
|
|
|
Submission of insulation information.
|
|
|
Cargo transfer devices and means.
|
|
|
Cargo and process piping standards.
|
|
|
Piping and piping system components: Protection from movement.
|
|
|
Mechanical expansion joint: Limits in a piping system.
|
|
|
Piping: Thermal isolation.
|
|
|
Piping: Electrical bonding.
|
|
|
Piping: Liquid pressure relief.
|
|
|
Piping joints: Welded and screwed couplings.
|
|
|
Piping joints: Flange connection.
|
|
|
Piping joints: Flange type.
|
|
|
Valves: Cargo tank MARVS 69 kPa gauge (10 psig) or lower.
|
|
|
Valves: Cargo tank MARVS greater than 69 kPa gauge (10 psig).
|
|
|
Cargo pumps and cargo compressors.
|
|
|
Cargo tank gauging and measuring connections.
|
|
|
Cargo transfer connection.
|
|
|
Quick-closing shut-off valves: Emergency shut-down system.
|
|
|
Quick-closing shut-off valves.
|
|
|
Excess flow valve: Closing flow.
|
|
|
Cargo piping: Flow capacity.
|
|
|
Excess flow valve: Bypass.
|
|
|
Cargo hose: Compatibility.
|
|
|
Cargo hose: Bursting pressure.
|
|
|
Cargo hose: Maximum working pressure.
|
|
|
Cargo hose: Prototype test.
|
|
|
Cargo hose: Hydrostatic test.
|
|
|
Design temperature not colder than 0 °C (32 °F).
|
|
|
Design temperature below 0 °C (32 °F) and down to −55 °C (−67 °F).
|
|
|
Design temperature below −55 °C (−67 °F) and down to −165 °C (−265 °F).
|
|
|
Design temperature below 0 °C (32 °F) and down to −165 °C (−265 °F).
|
|
|
Cargo tank and process pressure vessel welding.
|
|
|
Stress relief for independent tanks type C.
|
|
|
Cargo pressure and temperature control: General.
|
|
|
Cargo boil-off as fuel: General.
|
|
|
Cargo boil-off as fuel: Fuel lines.
|
|
|
Cargo boil-off as fuel: Ventilation.
|
|
|
Cargo boil-off as fuel: Valves.
|
|
|
Cargo boil-off as fuel: Gas detection equipment.
|
|
|
Alternate pressure relief settings.
|
|
|
Capacity of pressure relief valves.
|
|
|
Atmospheric control within cargo tanks and cargo piping systems.
|
|
|
Atmospheric control within hold and interbarrier spaces.
|
|
|
Inert gas systems: General.
|
|
|
Inert gas system: Controls.
|
|
|
Inert gas generator: Location.
|
|
|
Inert gas piping: Location.
|
|
|
Inerted spaces: Relief devices.
|
|
|
Electrical equipment in gas-dangerous space or zone.
|
|
|
Lighting in gas-dangerous space.
|
|
|
Exterior water spray system: General.
|
|
|
Areas protected by system.
|
|
|
Pipes, fittings, and valves.
|
|
|
Dry chemical system: General.
|
|
|
Distribution of dry chemical.
|
|
|
Hand hose line: Coverage.
|
|
|
Monitor coverage of system.
|
|
|
Mechanical ventilation system: General.
|
|
|
Mechanical ventilation system: Standards.
|
|
|
Hold space, void space, cofferdam, and spaces containing cargo piping.
|
|
|
Liquid level gauging system: General.
|
|
|
Liquid level gauging system: Standards.
|
|
|
Closed gauge shut-off valve.
|
|
|
Restricted gauge excess flow valve.
|
|
|
Sighting ports, tubular gauge glasses, and flat plate type gauge glasses.
|
|
|
Liquid level alarm system: All cargo tanks.
|
|
|
Liquid level alarm system: Independent tank type C.
|
|
|
Pressure and vacuum protection.
|
|
|
Temperature measuring devices.
|
|
|
Flammable gas detection system.
|
|
|
Audible and visual alarms.
|
|
|
Pressure gauge and vacuum gauge marking.
|
|
|
Readout for temperature measuring device: Marking.
|
|
|
Safety equipment: All vessels.
|
|
|
Stretchers and equipment.
|
|
Subpart D--SPECIAL DESIGN AND OPERATING REQUIREMENTS
|
Materials of construction.
|
|
|
Exclusion of air from cargo tank vapor spaces.
|
|
|
Ethylene oxide: Loading and off loading.
|
|
|
Methyl acetylene-propadiene mixture.
|
|
|
Vinyl chloride: Inhibiting and inerting.
|
|
|
Vinyl chloride: Transferring operations.
|
|
|
Butadiene or vinyl chloride: Refrigeration system.
|
|
Subpart E--OPERATIONS
|
Special operating requirements under Part 35 of this chapter.
|
|
|
Certificates, letters, and endorsements: U.S. flag vessels.
|
|
|
Certificates, letters and endorsements: Foreign flag vessels.
|
|
|
Expiration of Certificates of Compliance.
|
|
|
Document posted in wheelhouse.
|
|
|
Limitations in the endorsement.
|
|
|
Loading and stability manual.
|
|
|
Operational information for terminal personnel.
|
|
|
Certification of inhibition.
|
|
|
Shipping document: Copy for transfer terminal.
|
|
|
Obstruction of pumproom ladderways.
|
|
|
Opening of cargo tanks and cargo sampling.
|
|
|
Spaces containing cargo vapor: Entry.
|
|
|
Persons in charge of transferring liquid cargo in bulk or preparing cargo tanks.
|
|
|
Vapor venting as a means of cargo tank pressure and temperature control.
|
|
|
Discharge by gas pressurization.
|
|
|
Cargo system: Controls and alarms.
|
|
|
Cargo tanks: Filling limits.
|
|
|
Relief valves: Changing set pressure.
|
|
|
Entering cargo handling spaces.
|
|
|
Integral tanks: Cargo colder than −10 °C (14 °F).
|
|
|
Posting of speed reduction.
|
|
|
Vessel speed within speed reduction.
|
|
|
Cargo hose connection: Transferring cargo.
|
|
|
Portable blowers in personnel access openings.
|
|
|
Cargo emergency jettisoning.
|
|