46 C.F.R. PART 54--PRESSURE VESSELS
TITLE 46--Shipping
CHAPTER I--COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
SUBCHAPTER F--MARINE ENGINEERING
PART 54--PRESSURE VESSELS
Subpart 54.01--GENERAL REQUIREMENTS
|
Incorporation by reference.
|
|
|
Adoption of division 1 of section VIII of the ASME Code.
|
|
|
Scope (modifies U-1 and U-2).
|
|
|
Steam generating pressure vessels (modifies U-1(e)).
|
|
|
Exemptions from shop inspection and plan approval (replaces U-1(c) (6) through (9)).
|
|
|
Pressure vessel for human occupancy (PVHO).
|
|
|
Miscellaneous pressure components (modifies UG-11).
|
|
|
Loadings (modifies UG-22).
|
|
|
Corrosion (modifies UG- 25).
|
|
|
External pressure (modifies UG-28).
|
|
Subpart 54.03--LOW TEMPERATURE OPERATION
Subpart 54.05--TOUGHNESS TESTS
|
Toughness test specimens.
|
|
|
Toughness test temperatures.
|
|
|
Certification of material toughness tests.
|
|
|
Weldment toughness tests--procedure qualifications.
|
|
|
Production toughness testing.
|
|
|
Weld toughness test acceptance criteria.
|
|
|
Impact test properties for service of 0 °F and below.
|
|
|
Allowable stress values at low temperatures.
|
|
Subpart 54.10--INSPECTION, REPORTS, AND STAMPING
|
Scope (modifies UG-90 through UG-103 and UG-115 through UG-120).
|
|
|
Marine inspectors (replaces UG-90 and UG-91, and modifies UG-92 through UG-103).
|
|
|
Maximum allowable working pressure (reproduces UG-98).
|
|
|
Standard hydrostatic test (modifies UG-99).
|
|
|
Pneumatic test (modifies UG-100).
|
|
|
Manufacturers' data report forms (modifies UG-120).
|
|
Subpart 54.15--PRESSURE-RELIEF DEVICES
|
General (modifies UG-125 through UG-136).
|
|
|
Definitions (modifies UA-60).
|
|
|
Protective devices (modifies UG-125).
|
|
|
Safety and relief valves (modifies UG-126).
|
|
|
Rupture disks (modifies UG-127).
|
|
|
Relief devices for unfired steam boilers, evaporators, and heat exchangers (modifies UG-126).
|
|
|
Minimum relief capacities for cargo tanks containing compressed or liquefied gas.
|
|
Subpart 54.20--FABRICATION BY WELDING
|
Scope (modifies UW-1 through UW-65).
|
|
|
Fabrication for hazardous materials (replaces UW-2(a)).
|
|
|
Design (modifies UW-9, UW-11(a), UW-13, and UW-16).
|
|
|
Welding qualification tests and production testing (modifies UW-26, UW-28, UW-29, UW-47, and UW-48).
|
|
Subpart 54.23--FABRICATION BY BRAZING
Subpart 54.25--CONSTRUCTION WITH CARBON, ALLOY, AND HEAT TREATED STEELS
|
Steel plates (modifies UCS-6).
|
|
|
Corrosion allowance (replaces UCS-25).
|
|
|
Requirement for postweld heat treatment (modifies UCS-56).
|
|
|
Radiography (modifies UW-11(a), UCS-57, UNF-57, UHA-33, and UHT-57).
|
|
|
Low temperature operation--ferritic steels (replaces UCS-65 through UCS-67).
|
|
|
Low temperature operation--high alloy steels (modifies UHA-23(b) and UHA-51).
|
|
|
Low temperature operation--ferritic steels with properties enhanced by heat treatment (modifies UHT-5(c), UHT-6, UHT-23, and UHT-82).
|
|
|
Welding of quenched and tempered steels (modifies UHT-82).
|
|
Subpart 54.30--MECHANICAL STRESS RELIEF
|
Limitations and requirements.
|
|
|
Method of performing mechanical stress relief.
|
|
|
Requirement for analysis and computation.
|
|